Published date: 5 September 2018

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 11 December 2017

Contract summary

Industry

  • Construction work - 45000000

Location of contract

SG1 1HN

Value of contract

£4,000,000 to £4,500,000

Procurement reference

ech715 / CCDxxx - AWARD

Published date

5 September 2018

Closing date

11 December 2017

Contract start date

6 August 2018

Contract end date

5 August 2022

Contract type

Works

Procedure type

Restricted procedure

A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

Stevenage Borough Council is seeking solutions from suitably qualified and experienced Service Providers to enter into a long-term partnering arrangement for the delivery of works (the 'Term Programme'). The current intention is that works will be delivered to approximately 15 sheltered housing blocks although the potential to vary the scope of the works is included within the contract. Works will be carried out with residents, many of whom are vulnerable, remaining in occupation throughout the duration of the works therefore must be planned and delivered to ensure disturbance is minimised and safe access/egress to each individual dwelling is maintained at all times.

The works typically comprise the following;
1) Plantroom works such as:
- Install temporary boiler system and other temporary equipment
- Strip out and disposal of existing boiler room equipment
- Removal of structural plinths where required
- Installation of replacement heating and hot water system (including gas boilers, air source heat pumps, combined heat and power (CHP) and solar thermal)
- Installation of new flue and ancillary equipment (pressurisation units, DHW pumps, controls and control panel, safety system)
- Installation of electrical services to support the works
- Installation and modification of boiler room pipework (all services) and insulation
- Builder's work and fire stopping


2) Distribution works such as:
- Strip out of existing and installation of new LTHW heating distribution pipework to dwellings
- Strip out of existing and installation of new DHW distribution pipework to dwellings
- Removal and reinstatement of ceilings (with access panels) to aid replacement of pipework distribution
- Installation of heat metering equipment (such as inline heat meters, heat cost allocators)
- Builder's work and fire stopping

Stevenage's requirement is to select a Service Provider that is appropriate to undertake the works under a 4- year Term Partnering Contract. Full details are in the draft copy tender documents.

To access this opportunity please visit www.supplyhertfordshire.uk
SBC will be providing an opportunity for all interested suppliers to attend a briefing as set out in the SQ. The purpose of this briefing will be to provide an introduction to Stevenage as well as an overview of the procurement process and the objectives of the procurement exercise.


Award information

Awarded date

11 July 2018

Contract start date

6 August 2018

Contract end date

5 August 2022

Total value of contract

£4,389,859.15

This contract was awarded to 1 supplier.

Mulalley and Company Ltd

Address

Teresa Gavin House, Woodford Avenue, Woodford Green, Essex, United Kingdom, IG8 8FA

Reference

None

Supplier is SME?

No

Supplier is VCSE?

No


About the buyer

Contact name

Sharon Wallace (SBC)

Address

Danestrete
Stevenage
Hertfordshire
SG1 1HN
United Kingdom

Telephone

01438 242854

Email

sharon.wallace@stevenage.gov.uk