Published date: 29 October 2020
Closed future opportunity - This means that a potential contract has passed its approach to market date. A buyer can choose to consider any supplier interest or convert this notice into an opportunity ready for live procurement.
Contract summary
Industry
Repair and maintenance services - 50000000
Location of contract
London
Value of contract
£4,000,000 to £8,000,000
Procurement reference
tender_246934/883652
Published date
29 October 2020
Approach to market date
29 October 2020
Contract start date
5 April 2021
Contract end date
4 March 2024
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Summary of the Blackfriars Bridge Refurbishment Project
The Blackfriars Bridge Refurbishment project will deliver the full refurbishment of the cast iron parapets as well as the maintenance painting of one of the Thames' most iconic crossing points.
Blackfriars Bridge was built in 1869 carries the A201 as well as a cycle superhighway over the River Thames. The bridge structure is owned by Bridge House Estates and managed by the City of London. The bridge is Grade 2 listed.
The General Inspection in January 2018 noted that the parapets are in a poor condition with a large proportion of the parapet balusters cracking in places. A refurbishment of the existing parapet was decided upon as the most appropriate course of action.
The condition of the paint system has also starting to deteriorate significantly since the bridge's last maintenance painting circa 2000, particularly on the decorative fascia ribs. In the last painting contract the paint was removed back to bare metal. A full maintenance paint of the structure is also therefore required.
The bridge is a key transport link within the City of London, one of the busiest crossings over the River Thames as well as the location of one of the busiest work sites for the Tideway Tunnel project on the River Thames.
The works will include, as a non-exhaustive list:
i) Repair and renovation of the cast iron parapets to Blackfriars Bridge.
ii) Creating a suitable access system to the underside of the deck that satisfies requirements of all stakeholders.
iii) Preparation and maintenance painting of the 5 spans of the bridge.
Pedestrian and vehicular traffic on the bridge is not to have any significant interruptions during the works.
The estimated contract value given is for the full duration of the contract including the maximum possible extensions. The estimated annual contract value is therefore £1,416,666.00.
More information
Links
-
- www.capitalesourcing.com
- Tender notice
- Tender Documents
Additional text
-
This will be an OJEU Restricted procedure, and will published via the capitalEsourcing portal. Ref: pqq_CoL_1528.
About the buyer
Contact name
Hirdial Rai
Address
Guildhall
London
EC2P 2EJ
England
Share this notice
Approach to market date: 29 October 2020
All content is available under the
