Published date: 16 February 2021

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 31 March 2021, 12pm

Contract summary

Industry

  • Railway-track construction materials and supplies - 34946000

  • Railway materials - 34946120

  • Building construction work - 45210000

    • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork - 45230000

    • Railway depot construction work - 45234112

Location of contract

B4 6GA

Value of contract

£275,000,000

Procurement reference

tender_175951/925638

Published date

16 February 2021

Closing date

31 March 2021

Closing time

12pm

Contract start date

15 March 2023

Contract end date

14 March 2028

Contract type

Works

Procedure type

Other: Find a Tender Service

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

The WWH&NICC Contractor will be responsible for the design, fabrication, assembly, supply, construction, installation, supervision, inspection, testing, system commissioning and safety authorisation of a rolling stock depot and the design, build and commissioning of a Network Integrated Control Centre at Washwood Heath in Birmingham (including maintenance of all the works up to their completion). The Washwood Heath Depot will be the single rolling stock maintenance and servicing facility for HS2 Phase One.
The scope is further detailed in the PQQ pack and Contract Notice but includes:
- A maintenance building located within the depot - building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, welfare and domestic provisions, building security and a building management system. The maintenance building will contain light and heavy maintenance plant and equipment facilities (gantry cranes, mono rail cranes, access gantries, access pits, inspection and maintenance roads, heavy cleaning facility, heavy lift and bogie drop facilities, depot offices, depot control centre, pantograph test facility, biohazard facility, building management system and workshop and storage areas etc);
- Depot infrastructure including: reception/departure roads, track/permanent way, test track, switches & crossings, overhead catenary system, stabling/cleaning sidings, depot signalling system, depot protection system, telecoms system, automatic vehicle inspection units, wheel lathe(s), carriage wash machines, toilet emptying facilities, platforms, walkways, train crew booking facilities and a separate heavy cleaning facility. Provision of non-traction High Voltage and Low Voltage power network for all plant, equipment and buildings and all Protection & Controls and Supervisory Control and Data Acquisition associated with the traction and non-traction switchgear. Provision of all mechanical and electrical systems throughout the depot and associated buildings;
- A Network Integrated Control Centre building located within the depot area, including building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, operational and incident control rooms, training and IT systems room, offices, ancillary rooms, welfare and domestic provisions, building services, building security and a building management system;
- Car parking facilities, gatehouse, site security and lighting within the depot area and the provision of site drainage and all utilities related to the depot and connections to the main utility networks;
- Design integration with the other HS2 Ltd contractors (Rail Systems, Civils, Rolling Stock and the Depot Facility Owner (DFO));


More information

Links


About the buyer

Contact name

Procurement

Address

High Speed Two (HS2) Ltd, Two Snowhill, Queensway
Birmingham
B4 6GA
England

Telephone

0

Email

SCC@hs2.org.uk