Published date: 30 November 2023

Last edited date: 2 January 2024

This notice was replaced on 24 April 2024

This notice does not contain the most up-to-date information about this procurement. The most recent notice is:

Awarded contract (published 24 April 2024)

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Contract summary

Industry

  • Construction work - 45000000

Location of contract

United Kingdom

Value of contract

£70,000 to £100,000

Procurement reference

6B0EAEE2-FC92-4B5C-A000-6A41B42DE787

Published date

30 November 2023

Closing date

12 January 2024

Closing time

1pm

Contract start date

29 January 2024

Contract end date

28 June 2024

Contract type

Works

Procedure type

Restricted procedure (above threshold)

A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.

This procedure can be used for procurements above the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

For a full description along with instructions about this tender please refer to the tender pack included with this requirement.
The proposal is to create a new, sinuous path from Victoria Walk through to the existing entrance of the History of the Rose Garden. New planting beds will then be created along this path to group the regenerated wild roses closer together and explain their history and characteristics to visitors.
The main route will be surfaced with a resin bound gravel to match that of The Great Boardwalk Borders at RBG Kew. A narrower, secondary path will wind its way through existing trees which support climbing roses within more naturalistic planting. All paths will be set on a free draining,cellular confinement system using a no dig approach adjacent to trees. Surrounding soil will be graded up to meet the levels of the new paths. The entrance to the walkway will be paved with granite setts to highlight the beginning of the Story of the Rose, starting with the Wild Rose Collection.
There are two existing in ground water points on the site that will require protection during the works. These will be retained for use with new overground soaker hoses to irrigate the new planting.
This opportunity has been distributed on adamprocure.co.uk


More information

Links


About the buyer

Contact name

David Prior

Address

Kew Green
225 High Road
London
TW9 3AE
United Kingdom

Email

LCP@haringey.gov.uk

Website

https://londonconstructionprogramme.co.uk