Published date: 30 May 2025
Last edited date: 30 May 2025
Closed early engagement
Contract summary
Industry
Footpath construction work - 45233161
Location of contract
South West
Procurement reference
300525
Published date
30 May 2025
Closing date
19 June 2025
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
To create a new pedestrian footpath on the section of road shown in Chiseldon Wiltshire. Hodson Road (B4005) from the Hodson hamlet T junction to the Burderop Barns T junction. (This would be subject to permissions being given by Swindon Borough Council) You should be able to liaise with Swindon Borough Council to obtain all relevant permissions and permits.
The path should conform to the required current build standards required by Swindon Borough Council as the Highways authority.
To provide suitable safety protection (barriers etc) for the workforce for the duration of the project
To remove and correctly dispose of all waste materials - your waste licence will need to be seen by council staff.
To note that the path may need to be built along different sides of the road in different areas.
Approximate total length 1101.5 metres.
A map can be provided on request.
Contact for quotes and further information should be made to the Parish Clerk Clair Wilkinson - clerk@chiseldon-pc.gov.uk
More information
Attachments
-
- Hodson Road new pathway Map..png
- Project plan
- Document showing the proposed location for the footpath
Additional text
-
It is acceptable to submit a quote to the nearest £1000 at this stage.
About the buyer
Contact name
Clair Wilkinson
Address
The Old Chapel, Butts Road
Chiseldon
SN40NW
England
Telephone
01793 740744
Website
Share this notice
Closing date: 19 June 2025