Contract summary

Industry

  • Ground-stabilisation work - 45111230

  • Ground-drainage work - 45111240

  • Landscaping work for roads and motorways - 45112730

    • Siteworks - 45113000

    • Construction work for buildings relating to health and social services, for crematoriums and public conveniences - 45215000

    • Special medical building construction work - 45215120

    • Diagnostic screening room construction work - 45215143

    • Parking lot construction work - 45223300

    • Construction work for electricity power lines - 45231400

    • Construction work for highways, roads - 45233100

    • Secondary road construction work - 45233123

    • Building completion work - 45400000

Location of contract

GU2 7XX

Value of contract

£0

Procurement reference

IT-504-12-HPL/RSH/2022_23/MCDH

Published date

5 August 2022

Closing date

31 August 2022

Closing time

12:30pm

Contract start date

1 February 2023

Contract end date

1 February 2024

Contract type

Works

Procedure type

Restricted procedure (above threshold)

A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.

This procedure can be used for procurements above the relevant contract value threshold.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

The Royal Surrey NHS Foundation Trust propose to develop a new-build facility for Magnetic Resonance Imaging (MRI) and Computed Tomography Imaging (CTI) at the Milford Hospital, Tuesley Lane, Godalming, Surrey GU7 1UF. The building is single-storey with a link corridor to the existing Rehabilitation Building at Milford Hospital. The building also has plant rooms and a service yard with an acoustic fence to accommodate the mechanical and electrical services at the rear. Associated works include the construction of a new access road from Tuesley Lane that will be initially used for construction, and on completion will be re-surfaced for maintenance, servicing, deliveries and access for waste-bin vehicles. Also proposed is the provision of additional car parking for 18 cars, 3 motorbikes, and 6 bicycle racks, the erection

of an electricity substation, and the installation of foul drainage and attenuation soakaway for SUDS drainage

The site was considered suitable and viable for this facility as it would help the Royal Surrey NHS Foundation Trust in its quest to be become a pre-eminent cancer hub in the South-East of England. Milford Hospital already provides plain X-Ray and ultrasound facilities and the location of MRI and CT diagnostic imaging will suitably complement the existing facilities and widen the scope of available diagnostic imaging services across the Royal Surrey Hospital sites.

Milford Hospital lies in a site of approximately 2.3hectares. It accommodates a 1980s ward block known as the Rehabilitation Building having an area of 1,764m2, a 1½ storey newly refurbished X-Ray block of 122m2, a two-storey Victorian building for Community Services Management offices, a small, detached building shed and a redundant building. The site for the new diagnostics centre is the grassed area to the east of the Rehabilitation Building and bounded by a wooded strip to the north and the east towards Tuesley Lane.

The new Milford Diagnostics Building is 1,963.15m2 consists of:

· Clinical Facilities:

o 2no MRI Scanner Rooms, Control Rooms, Engineering Technical Rooms

o 1no CT Scanner Room, Control Room

o Patient Cannulation Rooms

o Counselling and Interview Rooms

o Recovery Rooms

o Patient Changing Rooms

o Patient WCs

o Clean and Dirty Utility Rooms

· Staff and Non-Clinical Facilities

o Reception

o Main Waiting Room

o Sub-Waiting Room for CT

o Offices

o Staff Changing Rooms

o Staff WCs

· Mechanical and Electrical Services

o Service Yard

o Plant Room

o Generator Room

o Medical Gas Storage

o Low Voltage Electrical Room

o Oil Bunding Tank

o Service Void floor in the roof space above the ground floor accommodation with 3no roof access shafts into the service void.

o Bin Enclosure

o Acoustic Fencing

Associated works consist of:

· External...


More information

Links

Additional text

Is a Recurrent Procurement Type? : No