Published date: 14 May 2018

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 15 June 2018

Contract summary

Industry

  • Site-reclamation work - 45112330

  • Quay construction work - 45241100

  • Marine construction works - 45244000

    • Dredging and pumping works - 45252124

    • Engineering design services for the construction of civil engineering works - 71322000

Location of contract

North East

Value of contract

£19,000,000

Procurement reference

ARCH001-DN339987-24676834

Published date

14 May 2018

Closing date

15 June 2018

Contract start date

18 December 2018

Contract end date

29 June 2020

Contract type

Works

Procedure type

Negotiated procedure

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

Further information will be provided in the Selection Questionnaire (SQ) and Invitation to Negotiate (ITN) documents however in summary, the scheme consists of, but is not limited to,

Site clearance and removal of vegetation, topsoil and hardstanding

Ground remediation as necessary, of the localised soils and groundwater's.

Removal of relic structures

Construction of a deep berth extension of the ash barge dock to allow vessels with a draft of up to 9.0m to use the berth

Formation of a new piled quay wall on land, excavating existing soils between the new wall and existing wall and breaking out existing relic structures and finally removing the existing quay wall.

Dredging with suitable batters formed between the dredge pockets and the tidal basin and a 10m wide open quay structure formed at the rear of the existing dock using tubular steel piles.

Construction of a new open quay structure to the landward end of the existing ash barge dock.


About the buyer

Address

Arch Enterprise Centre,
Lintonville Parkway
Ashington
NE639JZ
England

Email

lara.baker@arch-group.com