Industry
Site-reclamation work - 45112330
Quay construction work - 45241100
Marine construction works - 45244000
Dredging and pumping works - 45252124
Engineering design services for the construction of civil engineering works - 71322000
Location of contract
North East
Value of contract
£19,000,000
Procurement reference
ARCH001-DN339987-24676834
Published date
14 May 2018
Closing date
15 June 2018
Contract start date
18 December 2018
Contract end date
29 June 2020
Contract type
Works
Procedure type
Negotiated procedure
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
Further information will be provided in the Selection Questionnaire (SQ) and Invitation to Negotiate (ITN) documents however in summary, the scheme consists of, but is not limited to,
Site clearance and removal of vegetation, topsoil and hardstanding
Ground remediation as necessary, of the localised soils and groundwater's.
Removal of relic structures
Construction of a deep berth extension of the ash barge dock to allow vessels with a draft of up to 9.0m to use the berth
Formation of a new piled quay wall on land, excavating existing soils between the new wall and existing wall and breaking out existing relic structures and finally removing the existing quay wall.
Dredging with suitable batters formed between the dredge pockets and the tidal basin and a 10m wide open quay structure formed at the rear of the existing dock using tubular steel piles.
Construction of a new open quay structure to the landward end of the existing ash barge dock.