Industry
Building installation work - 45300000
Urban planning and landscape architectural services - 71400000
Aquaculture services - 77800000
Location of contract
co5 0tj
Value of contract
£100,000 to £250,000
Procurement reference
TPC01001/22
Published date
8 September 2022
Closing date
8 July 2022
Closing time
11:59am
Contract start date
1 August 2022
Contract end date
30 September 2022
Contract type
Works
Procedure type
Competitive quotation (below threshold)
The buyer selects a group of potential suppliers to invite to tender.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
Re-Build (including draining and silt removal) of Grove Lake Duck Pond - Specifically, the repair of the walkways (root damage), the walls of the lake where brickwork is failing, the removal of silt from the lake (approx cubic 290m), delivery of SILT trap for two x inlets.
Detailed work as follows:
Work Schedule: - Silt Removal:
Silt in Pond - approx. 290 cube
• Cofferdams to be set up splitting the pond into 3 or 4 areas
• Inlets and outlet to be diverted where required
• Silt allowed to drain and then removed from Pond
• Silt to be stored and dried next to pond then taken away from site
• Disposal of silt as recommended by local authority (The Council may have a location to remove the silt too, via a local farmer and the Council's allotments, but this is not guaranteed).
Work Schedule - Walkway:
• The concrete walkway above the brick walls is no longer even, and provides a trip hazard for walkers. It has been repaired with Tarmac in order to get the differing levels to "meet", but now requires re-setting to ensure an even walkway around the entire pond.
Work Schedule - Wall Damage:
• As the damage to the walls is only visual above the water line a further inspection would be required when each section is drained
• All existing brickwork to be jet washed for closer inspection
• Any failing brickwork to be replaced
• Any lose mortar to be replaced between brickwork
• The movement in the walls will make future guarantees limited on any works undertaken
Note: The pond is not leaking, and the base of the pond is estimated to be a proportion of cement, and a proportion of clay (the surrounding area is made up of London Clay)
Work Schedule - Island:
• An inspection is required below water line of the brickwork
• Some copings to be re-laid or replaced as necessary
Work Schedule - Introduction of Aquatic Planting:
• It would be possible to introduce some planting zones, but these would be required to be separated from the fish
• Shallow marginals or floating planters could be introduced
• Plants provide a balanced aquatic eco-system and would help keep the phosphate levels lower
Work Schedule: Inlets and outlets
• The outlet could be modified to allow for greater collection of silt and floating debris, this could help alleviate any future flooding of the road
• The inlet from the feeder SuDS pond requires a silt trap, as currently it appears as an open pipe
More information
Previous notice about this procurement
Tiptree Parish Council: Rebuild (including silt removal) of Duck Pond
- Opportunity
- Published 9 June 2022
Attachments
-
- Lake re-build ITT.pdf
- Tender notice
- Description (with pictures) of Tender
Award information
Awarded date
3 August 2022
Contract start date
30 August 2022
Contract end date
30 September 2022
Total value of contract
£81,309
This contract was awarded to 1 supplier.
The A.G.A. group Limited
Address
Merton Hall Ponds
Merton
Thetford
IP25 6QHReference
No reference - other
Value of contract
£81,309
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Contact name
Rob Williams
Address
56 Church Road, Tiptree
Tiptree
Colchester
CO5 0SU
United Kingdom
Telephone
01321817030
clerk@tiptreeparishcouncil.gov.uk
Website
Share this notice
Closing: 8 July 2022, 11:59am