Published date: 12 October 2020

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 19 October 2020, 12pm

Contract summary

Industry

  • Public utilities - 65000000

  • Engineering design services for the construction of civil engineering works - 71322000

Location of contract

Any region

Value of contract

£30,000,000 to £40,000,000

Procurement reference

C4N51206548

Published date

12 October 2020

Closing date

19 October 2020

Closing time

12pm

Contract start date

19 April 2021

Contract end date

28 April 2023

Contract type

Works

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

Mace Dragados are seeking expressions of interest from subcontractors to undertake complex utility diversion and protection works. The scope of the package consists of detailed design services and construction works with complex sequencing requirements to complete the utility diversionary and protection works. The works shall be undertaken in the vicinity of the Euston Station work site in London.

Utility assets in scope are as follows:

- Large diameter Sewer Diversions
- Sewer Lining & Strengthening works
- Large diameter Watermain Diversions
- Civils works enabling multiple Electrical Substation relocations and power cable diversions
- Ducting provision for communications diversions

Key trades include: RC Works; Shaft Sinking & Pipe Jacking; Deep Excavations; Specialised TW Sewer Entry works

Design shall be developed by Lloyds Register Utilities accredited organisations: NERS, GIRS, WIRS


Works shall be contracted under NEC3 Engineering Construction Subcontract terms and conditions (with project specific amendments)


Suppliers must have extensive demonstrable experience of delivering complex major utility diversion works and associated design on previous projects of a similar scale (large infrastructure projects). This experience must applicable and relevant to the opportunity.

If successful selected suppliers will be required to go through Mace Dragados pre-qualification process to be included on the final tender list.
Mace Dragados have been appointed as the Construction Partner to build a fully-integrated HS2 station at London Euston, together with links to the existing London Underground station.


More information

Links


About the buyer

Contact name

Tim Sargent

Address

Euston House, 24 Eversholt Street
London
NW11BS
UK

Telephone

02076510900

Email

procurement@macedragados.com