Published date: 22 November 2017
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Street-lighting equipment - 34928500
Highway maintenance work - 45233139
Installation of outdoor illumination equipment - 45316100
Installation of road lighting equipment - 45316110
Installation of illuminated road signs - 45316211
Street-lighting maintenance services - 50232100
Location of contract
East Midlands
Value of contract
£100,000
Procurement reference
LEICSCC001-DN301341-96639685
Published date
22 November 2017
Closing date
3 November 2017
Contract start date
1 December 2017
Contract end date
31 August 2018
Contract type
Service contract
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The work to be carried out is detailed below: -
• Collect all necessary equipment (pole bracket, box with cut-out, pre wired LED lanterns and CMS nodes) from Mountsorrel Depot or Croft Depot
• Provide basic layout Traffic Management as required by "ADDENDUM TO APPENDIX 1/17 TRAFFIC SAFETY AND MANAGEMENT"
• Disconnect existing EME overhead pole brackets for transfer to new equipment.
• Take down and remove to customers skips in Mountsorrel depot existing O/H pole bracket, box, cable and lantern.
• Install new free issue pole bracket, box, cut-out, LED lantern (0° Tilt) and CMS node no more than 6m above ground level and no less than 1.3m from pole terminals.(In general the new lanterns should be sited in positions where the Customers direct workforce can maintain the lanterns in the future, without seeking assistance from the electricity provider)
• Install new fuse block and transfer electrical connection then connect/commission new equipment.
• Record the CMS ID against location description and report back to LCC.
The specification will be the Manual of Contract Documents for Highway Works (MCHW), Volume 1: Specification for Highway Works.
Please note that further competition is invited, and a subsequent award will be made, in accordance with the terms and conditions of ESPO's overarching framework agreement 256_16 - except as may be varied herein.
Award information
Awarded date
22 November 2017
Contract start date
1 December 2017
Contract end date
31 August 2018
Total value of contract
£100,000
This contract was awarded to 1 supplier.
Eon UK Energy Solutions Ltd.
Address
Westwood Way Westwood Business Park Coventry (Head office), Nutts Lane, Hinckley, Leicestershire, LE10 3EG (local office)
Reference
None
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Contact name
Barbara Hunter
Address
Croft Depot
Arbor Road
Croft
LE9 3GE
England
Website
Share this notice
Closing: 3 November 2017
All content is available under the
