Published date: 26 February 2025
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Painting work - 45442100
Painting work of structures - 45442121
Repainting work - 45442180
Location of contract
HG4 1DD
Value of contract
£0
Procurement reference
Invitation to Tender for Cabman's Shelter Painting
Published date
26 February 2025
Closing date
2 April 2025
Closing time
11pm
Contract start date
9 April 2025
Contract end date
30 September 2025
Contract type
Works
Procedure type
Single tender action (below threshold)
A direct contract with a single supplier, without competition.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
1. Background
The Cabmen's Shelter currently rests in the East Corner of the Market Place Ripon. It is owned by Ripon City Council following donation from the Civic Society.
The Listed Building number is 1393142. It is a Grade 2 Listed Building. The reasons it is listed, are as follows:- It has a highly decorative Edwardian design dating from 1911. It is a nationally rare and well-preserved example of a cabmen's shelter, an important reminder of the importance of horse-drawn transport in the early C20, supplied by the well-known firm of Boulton and Paul of Norwich.
The structure of the Shelter remains in good order after its full restoration in 2019, however general wear & tear and its exposure to the elements are evident on some of the external paintwork. This is most noticeable on the Southern Elevation where the entrance is located and more generally around the lower boards of the Shelter.
2. Our requirements
Restoration of exterior paintwork specification:
External paintwork to be rubbed down, remove all loose and flaking paint.
Repair work to minor chips or gouges on the external structure. (see example in 'West Elevation Left Hand Side Damage' image in the Appendix 1)
If required, reseal the horizontal joint between the vertical timber frame and the sill with an oil-based mastic to prevent water penetration.
Prime all bare areas, apply one undercoat and coat gloss oil paint to match the existing colours.
The work is to be completed with Cabman Shelter in-situ.
The work is to be completed during summer/Autumn 2025 season.
We expect the tender to include:
• Provision of all materials for exterior painting, using recognised and certified parts only
• Method Statement for completion of works including process to be used for painting the Cabman Shelter in-situ.
We are looking for a reputable and qualified company who can provide us with value for money.
About the buyer
Contact name
Paula Benson
Address
Town Hall
RIPON
HG41DD
England
Telephone
01765604097
Share this notice
Closing: 2 April 2025, 11pm