Published date: 14 December 2016
This notice was replaced on 11 July 2018
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Awarded contract (published 11 July 2018)
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Construction work - 45000000
Location of contract
South West
Value of contract
£30,000
Procurement reference
SUBC9116
Published date
14 December 2016
Closing date
21 December 2016
Contract start date
13 February 2017
Contract end date
1 November 2017
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Construction of mass concrete retaining wall with reinforced concrete parapet
• Including some backfilling works (e.g. no fines concrete, scope tbc)
• Includes access path and steps/handrail at base of wall
• Includes dry stone parapet section to tie in with existing dry stone parapet
• Subcontractor to design all temporary works required for their works
• No subcontract design of the permanent works.
• Compliance with CORMAC's Health and Safety system and ensure the health and safety of your personnel and others whilst at work. All personnel will receive an induction prior to working.
• Compliance with our Site Safety Management System procedures which include for production of regular Safety Check List documents, Risk Assessments and Method Statements.
• To be committed, in the same way as CORMAC to a fully trained work force which will require personnel supplied by yourselves, to be correspondingly qualified to the appropriate scheme and to carry the relevant card at all times.
• Compliance with CORMAC's Environmental management system
• Compliance with CORMAC's Quality management system
• Compliance with CORMAC's Code of Conduct
The conditions of subcontract are the 3rd Edition (April 2013) of the NEC Engineering and Construction Short Contract as amended in subcontract enquiry.
Re-measured in accordance with BoQ and subcontract conditions of contract. The method of measurement is the Method of Measurement for Highway Works.
More information
Additional text
-
to express an interest & to obtain the tender documents please email procurement@cormacltd.co.uk quoting reference number SUBC9116.
About the buyer
Contact name
Gemma Parker
Address
Head Office
Higher Trenant
Wadebridge
PL27 6TW
England
Website
Share this notice
All content is available under the