Published date: 26 August 2021
Last edited date: 26 August 2021
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Construction work for bridges - 45221100
Waterproofing work - 45261420
Location of contract
SO21 2FG
Value of contract
£369,831
Procurement reference
BB-22
Published date
26 August 2021
Closing date
9 September 2021
Closing time
12pm
Contract start date
10 January 2022
Contract end date
31 December 2022
Contract type
Works
Procedure type
Competitive quotation (below threshold)
The buyer selects a group of potential suppliers to invite to tender.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
On behalf of the M3 Smart Motorway Alliance working with Highways England we (Balfour Beatty Civil Engineering Ltd) require Waterproofing works to be carried out on a total of 12 bridges and the installation of Expansion Joints on 9 bridges between Junctions 9 and 14 of the M3 project. Providers will be required to have the capacity to deliver works in the Southern Region, Winchester to Southampton. Terms and Conditions speciļ¬c to the works will be issued during the tender period for agreement in principle. To register your interest in these works your organisation must hold as a minimum: Constructionline Gold. Tenders will then be issued with a two week return period. Scoring will be carried out within 1 week of return date.
The Subcontract Scope for Waterproofing works will be people, Equipment, Plant and Materials to (where appropriate)
- Waterproofing to be applied in accordance with SHW Appendix 20/1. Spray applied waterproofing to be applied and lap as a minimum 150mm onto existing water proofing.
- There are 12No. underbridges which will require water proofing. There is approx. 125m2 of spray applied water proofing per bridge.
The Subcontract Scope may also include the sealing of gaps with 1200-gauge polythene sheeting.
The Subcontract Scope for Bridge Joints works will be people, Equipment, Plant and Materials to (where appropriate)
- Bridge deck joints to be installed as per SHW 2300 appendix 23/1. Bridge deck expansion joints shall satisfy the requirements of CD 357 'Bridge Expansion Joints'.
- There are 9No. bridges requiring new transverse joints totalling 20No. joints. There is 1No. longitudinal joint replacement.
1. Please confirm that you hold a Constructionline Gold account or Common Assessment Standard, of "Verified" status. Please provide a valid account number.
2. What are the most significant H&S challenges that you foresee on the Smart Motorways Alliance Projects and can you demonstrate how you as a company will mitigate against these challenges?
3. Provide details of your current and future secured workload (Dates, values, resource requirements) and confirm that you will have sufficient resource available to deliver to the scheme's requirements.
4. Please confirm if you have SMART Motorway Experience and detail which previous projects you have worked on if applicable.
5. Please provide ISO9001, ISO14001 and ISO45001 Certificates.
About the buyer
Contact name
Harriet Buffery
Address
5 Churchill Pl
London
E145HU
England
Telephone
07920 831 567
Share this notice
Closing: 9 September 2021, 12pm