Published date: 26 September 2024

This notice was replaced on 14 February 2025

This notice does not contain the most up-to-date information about this procurement. The most recent notice is:

Awarded contract (published 14 February 2025)

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Contract summary

Industry

  • Construction work - 45000000

Location of contract

England

Value of contract

£0 to £2,200,000

Procurement reference

GLOSCC001-DN742589-79793080

Published date

26 September 2024

Closing date

31 October 2024

Closing time

12pm

Contract start date

6 January 2025

Contract end date

30 May 2025

Contract type

Works

Procedure type

Other

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

This advert is intended to notify potential suppliers of the combined tender including both the Rushmire Hill Geotechnical remediation and the Standish Multi-User Path works. These two pieces of work have been packaged as a single tender.

Rushmire Hill Geotechnical Remediation
Rushmire Hill is in South Gloucestershire, near Wotton-under-Edge, approximately 1.2 km south of Cotswold Edge Golf Course. The works are required to stabilise the B4058 carriageway, which has historically suffered deterioration from ground movement. Remediation works will include sheet piling along the GCC owned verge, verge and carriageway reconstruction. Site clearance will also be required to facilitate the piling works.

Summary of Construction Phase key deliverables are as follows:
Site clearance including tree clearance over approx. 255m, 3.5m width.
Sheet piling installation along an approx. 255m length of verge.
Partial carriageway reconstruction of the northbound carriageway over 280m.
Carriageway resurfacing over approx. 300m
Ground investigation including the installation of 3 no. inclinometers and 1 no. slotted standpipe in the carriageway
Traffic Management during the construction works.
Maintain residents' access during the construction works.

Standish Multi User Path
The works are located between the Horsemarling Lane roundabout and Blackbridge access track to the south of Standish, Gloucestershire. This scheme is part of a wider strategic scheme to boost active travel provision within the county, through the creation of the Gloucestershire Cycle Spine and includes a section of bridle way.

Summary of Construction Phase key deliverables are as follows:
Construction of 400m of 3m wide new shared use path and bridal way
150m of carriageway realignment and works to splinter island
Streetlighting column installation and relocation. Columns will be supplied by GCC.
Utility diversion works (pre-arranged by GCC for Principal Contractor to liaise/accommodate).
Drainage works that tie-in to existing systems and includes ditch and attenuation pond construction.
Traffic Management during the construction works.
Maintain residents' access during the construction works

Gloucestershire County Council are seeking a Principal Contractor to deliver the construction phase of this project.

A summary of the outline programme for the combined packages of works is shown below:
Tender period: 26th Sep - 31st Oct 2024
Award: Monday 25th November 2024
Anticipated Works Start Date: Monday 6th January 2025
Completion: Friday 30th May 2025
Overall Duration: 22 weeks
Indicative Value: (£2.2M + £0.44M VAT) = £2.64M

The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.

Full details will be available in the tender pack advertised on Procontract Thursday 26th September 2024.

https://procontract.due-north.com/Advert?advertId=e79b7d6e-ad6f-ef11-812f-005056b64


About the buyer

Contact name

Mike McGowan

Address

Shire Hall
Gloucester
GL1 2TH
England

Telephone

+44 1452328900

Email

mike.mcgowan@gloucestershire.gov.uk

Website

https://www.gloucestershire.gov.uk