Published date: 22 May 2024

Last edited date: 20 June 2024

This notice was replaced on 24 August 2024

This notice does not contain the most up-to-date information about this procurement. The most recent notice is:

Awarded contract (published 24 August 2024)

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Contract summary

Industry

  • Crane and dumper trucks - 34142000

  • Cranes, mobile lifting frames and works trucks fitted with a crane - 42414000

  • Lifting, handling, loading or unloading machinery - 42418000

    • Parts of lifting and handling equipment - 42419000

    • Buckets, shovels, grabs and grips for cranes or excavators - 42420000

Location of contract

TR18 4BW

Value of contract

£700,000 to £940,000

Procurement reference

BUS003_0081 2.2

Published date

22 May 2024

Closing date

5 July 2024

Closing time

5pm

Contract start date

22 July 2024

Contract end date

30 March 2025

Contract type

Supply contract

Procedure type

Open procedure (above threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements above the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Penzance Dry Dock (PDD) is famously steeped in history, currently being the oldest operational dry dock of its type in Europe but requires drastic investment after decades of neglect and dilapidations. While the surrounding shipyards, across the county and country have seen investment, PDD has slipped through the net time and time again.
PDD plans to complete a large refit by March 2025. PDD will become the engineering powerhouse that it once was, but with more abilities than ever before. This facility has primally been ship repair only, but now we are supporting multiple areas of the market, ship repair, ship building, mass fabrication and most importantly training and skill development.
This capital investment, part-funded by the UK Government through the UK Shared Prosperity Fund, will see the site brought up to an even playing field with the rest of industry, with new, safer lifting systems and the dilapidations being rectified. We will see our efficiency drastically increased which in turn will assist in reducing our carbon footprint.

As part of this refit, PDD wishes to purchase 6 cranes:
Goliath x1
Gantry (x4 - two 10T cranes per bay)
Quayside Jib Crane x1

PDD will supply:
• The foundations (specification needs to be provided by this successful tenderer).
• Suitable test weights.
• 3 phase supply to the end of the bus bar systems and quayside jib crane.
• If required, Penzance Dry Dock can provide a dedicated space in the workshops, 100v, 240, and 440V supplies to allow the appointed team to work onsite at the docks for fabrication purposes (see plan). Please clearly detail this requirement in your tender response.

The successful tenderer shall provide all consumables, raw materials, PPE and labour to fabricate the cranes.

More details in the attached documentation.


More information

Attachments


About the buyer

Contact name

Jackie George

Address

Penzance Dry Dock
Penzance
TR18 4BW
England

Telephone

07300836922

Email

jackie.george@linkedsolutionsmarine.com