Published date: 10 July 2017
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Culverts - 45221220
Footpath construction work - 45233161
Track construction works - 45234116
Environmental improvement works - 45262640
Location of contract
Any region
Value of contract
£36,962
Procurement reference
tender_139279/597697
Published date
10 July 2017
Closing date
5 May 2017
Contract start date
12 June 2017
Contract end date
31 October 2017
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
Langley Wood National Nature Reserve is one 224 NNRs in England. As well as being important wildlife sites NNRs also play an important role in providing access to nature. In Langley Wood access is restricted to the Public Rights of Way. At certain times of the year large sections become impassable as the site becomes very wet. Improvements to these footpaths will enable visitors to access Langley Wood safely by keeping to the designated access routes.
Description
The aim of this work is to upgrade existing tracks within the woodland. The finished track must provide a hard surface that is dry, suitable for walking on and can be used throughout the year as emergency access by light vehicles without causing rutting.
Track specification
Width: 2.5m unless restricted by the existing track width
Depth: Minimum of 15cm once rolled and compacted or greater where necessary to achieve the described track.
Materials:
o A permeable geo-textile membrane should be used to retain aggregate.
o The base aggregate layer should be clean (i.e. free from glass, metal, plastic or other "waste" material).
o Top layer should be "as dug hoggin" thick enough to ensure none of the base layer is exposed after normal vehicular use.
Groundwork: soft earth and mud should be dug out where necessary to ensure the ground is flat and as far as possible solid before any track material are laid. Waste soil should be spread thinly next to the track of if necessary laid in a bank (location must be agreed on site). All groundwork must be undertaken without damaging tree roots.
Culverts: Where necessary to channel the flow of water under the track culverts should be installed. Pipes must be a minimum of 15cm in diameter and have timber retaining walls at each end.
Ditches: Where necessary to ensure the flow of water and to prevent erosion of the track existing.
More information
Previous notice about this procurement
For footpath improvements at Langley Wood National Nature Reserve (NNR)
- Opportunity
- Published 16 March 2017
Additional text
-
Please note that Defra procurement uses e-tendering, provided by Bravosolutions. In order to access the Bravo system you will need to be registered.
Could I therefore request that you register on the Bravo portal for Defra.
If you're already registered on the Bravo portal please check that your registration includes Defra, as you have to specify us in order to correctly receive the tender documents.
If you have any problems with the registration process, please contact the Bravo helpline on 0800 368 4850 or alternatively email them at help@bravosolution.co.uk. The link you require for new registration/amendments to registrations is -
https://defra.bravosolution.co.uk
Award information
Awarded date
12 June 2017
Contract start date
12 June 2017
Contract end date
31 October 2017
Total value of contract
£36,962.33
This contract was awarded to 1 supplier.
GM Utilities Limited
Address
Mount Pleasant farm, Lask Edge Road, Horton, Leek, Staffordshire, ST13 8QG, UNITED KINGDOM
Reference
None
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Address
Natural England
Peterborough
PE1 1NG
England