Published date: 26 February 2018
Last edited date: 26 February 2018
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Miscellaneous engineering services - 71330000
Location of contract
South West
Value of contract
£250,000
Procurement reference
DVNCC001-DN305979-39200378
Published date
26 February 2018
Closing date
8 December 2017
Contract start date
5 February 2018
Contract end date
21 December 2018
Contract type
Service contract
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
This Contract involves the Geotechnical Investigation into the A361 / A39 North Devon Link Road from the Borner's Bridge Junction at South Molton to the Buckleigh Road Junction near Bideford.
The ground investigation will comprise the following works:
• The excavation of mechanically dug trial pits to a maximum depth of 4m or refusal.
• Windowless sample borehole drilled by a dynamic sampling rig to depths as given in the Procurement Documents or refusal on rockhead. This is to include in-situ Standard Penetration Testing (SPT) and undisturbed sampling. Hand-dug starter pits shall be excavated at all exploratory borehole locations.
• Combine dynamic sample / rotary open hole / rotary cored boreholes to depths as given in the Procurement Documents . This is to include in-situ Standard Penetration Testing (SPT) and undisturbed sampling. Hand-dug starter pits shall be excavated at all exploratory borehole locations.
• Excavation of hand-dug trial pits in sides of existing cuttings and removal of vegetation to expose underlying rock mass to facilitate kinematic analysis.
• Excavation of hand dug pits at base of cutting where inaccessible to mechanical excavation/boring methods.
• Installation of groundwater monitoring standpipes in boreholes to a depth specified by the supervising engineer. Monitoring standpipes shall be 19mm diameter or greater.
• In-situ determination of California bearing Ratio (CBR) - to be undertaken using Dynamic Cone Penetration (DCP) equipment. The number and location of DCP tests required to provide sufficient coverage will be determined on site by the Investigation Supervisor.
• Groundwater monitoring is to be conducted following the completion of site works at intervals determined by the Investigation Supervisor. All installations shall be monitored to establish the elevation of groundwater.
• Geotechnical Laboratory testing on selected samples.
• Environmental/Chemical Laboratory testing on selected samples.
• Specific borehole requirements and Borehole location plans are detailed within the Procurement Documents.
• Provide Devon County Council with a Ground Investigation Report and Interpretation Report, plus design support. The procurement documents are available for unrestricted and full direct access, free of charge, at: http://www.supplyingthesouthwest.org.uk Tenders or requests to participate must be submitted electronically via: http://www.supplyingthesouthwest.org.uk
More information
Additional text
-
The procurement documents are available for unrestricted and full direct access, free of charge, at: http://www.supplyingthesouthwest.org.uk Tenders or requests to participate must be submitted electronically via: http://www.supplyingthesouthwest.org.uk
Award information
Awarded date
8 January 2018
Contract start date
5 February 2018
Contract end date
21 December 2018
Total value of contract
£125,000
This contract was awarded to 1 supplier.
Geotechnics Ltd
Address
7 Pinbrook Units, Venny Bridge,
Exeter
EX4 8JH
United KingdomReference
None
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Contact name
Alan Palmer
Address
County Hall, Lucombe House
Topsham Road
Exeter
EX2 4QD
United Kingdom
Telephone
+44 1392383000
Website
Share this notice
Closing: 8 December 2017