Contract summary

Industry

  • Roof - 44112400

  • Roof repair and maintenance work - 45261900

Location of contract

DN34 5BQ

Value of contract

£0

Procurement reference

IT-399-2850-TEC-RBR-24 - AWARD

Published date

20 February 2024

Closing date

16 February 2024

Closing time

12pm

Contract start date

8 April 2024

Contract end date

27 May 2024

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The project comprises of replacing the roof covering on our B Block building. This will require removing the existing roof and insulation before replacing. There are some structural repairs required to the parapet walling that will need to be conducted during this process. The details of this can be seen in document Rde6334.

In accordance with the Rde6334 recommendation, masonry repair is also required on the tower block, as seen in image 1.

It is proposed that the parapet walling is reduced to the height required to provide the adequate uplift for the replacing roofing, so a replacement capping system can be installed.

Enabling works for one section of roofing, will require the removal of an existing timber structure (image 2).

The proposed roofs are to be Sika liquid plastic and installed to accompanying specification (alternative products will be considered).

Full standards and services can be found in the Specification Document appended to this ITT - 0409764 Technical Specifications.pdf and PEU - 00734 cut to falls design.

The final stage of the project will be installing edge protection (image 3)

Other documents appended to this ITT:
o 01 Site Location Plan
o 02 B Block roof plan
o 040964 Site Survey Reports.pdf
o Rde6334 Structural survey
o PEU - 00734 cut to falls design
o Image 1 - wall repair
o Image 2 - Timber frame removal
o Image 3 - indicating edge protection area

Document 03 phase drawing is color coded into four sections. Section 1 (yellow) is the main focus of the works and the other elements will be decided on based on the overall project cost. Please ensure that your tender break down clearly states these itemised components.

Section 1 - Yellow
Section 2 - Blue
Section 3 - Green
Section 4 - Purple


Award information

Awarded date

20 February 2024

Contract start date

8 April 2024

Contract end date

27 May 2024

Total value of contract

£445,408.72

This contract was awarded to 1 supplier.

Tucker and Tunstalls Limited

Address

Northfield House, 33 Church Street, Ossett, United Kingdom, WF5 9DN

Reference

None


About the buyer

Contact name

Daniel Thompson

Address

Nuns Corner
Grimsby
North East Lincolnshire
DN34 5BQ
United Kingdom

Telephone

01472 927626

Email

thompsonda@grimsby.ac.uk