Published date: 19 April 2016

This notice was replaced on 19 April 2016

This notice does not contain the most up-to-date information about this procurement. The most recent notice is:

Awarded contract (published 21 July 2017)

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Contract summary

Industry

  • Construction work - 45000000

Location of contract

London, South East

Value of contract

£4,000,000

Procurement reference

DN126230

Published date

19 April 2016

Closing date

3 May 2016

Contract start date

1 October 2016

Contract end date

31 January 2018

Contract type

Works

Procedure type

Restricted procedure

A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

Construction of a new building with dining hall and staff room connected to existing building by a new enclosed walkway, remodelling of existing dining block and conversion into new classrooms and nursery unit and associated external works including a MUGA and increased car parking at Poverest Primary School, Tillingbourne Green. BR5 2JD.

The proposed works are shown on drawings issued with the PQQ.

The works will be undertaken in 3 sections:

Section 1 - Construction of New Dining Hall
Section 2 - Remodelling and conversion of upper site dining block into classrooms and nursery unit.
Section 3 - Completion of essential work within the school summer vacation period 2017 - inclusive of the new link bridge and enclosed walkway at first floor level connecting into existing classrooms.

The work will be undertaken within the occupied Primary School site. The appointment of a successful contractor is anticipated in October 2016 with a completion of the project by January 2018 or as otherwise directed by the Council.

The contractor's works will include completion of the detailed design beyond RIBA stage 4, and construction of the extension and remodelling and conversion of upper site under the JCT Design & Build 2011, including all builder's works and M&E works including connection into the existing school's systems.

The tender will be run electronically using the ProContract London Tenders Portal e-tendering system and suppliers interested in accessing the tender document will need to ensure that they are registered with the London Tenders Portal (if they have not already done so) at www.londontenders.org.

Full tender documentation is accessible via the London Tenders Portal and Applicants should complete only the Stage 1 Selection Documents at this stage. The Invitation to Tender and supporting documents should only be completed once an Applicant has been invited to submit a tender following assessment of the Stage 1 responses. Applicants will be informed if they are being invited or not being invited to submit a tender by the end of May 2016 (or as otherwise directed by the Council).


More information

Links


About the buyer

Contact name

Lorraine Baker

Address

Civic Centre
Stockwell Close
Bromley
BR1 3UH
England

Email

lorraine.baker@bromley.gov.uk

Website

www.bromley.gov.uk