Published date: 13 December 2022

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 14 February 2023, 12pm

Contract summary

Industry

  • Structural steelworks - 45223210

  • Mechanical engineering installation works - 45351000

  • Engineering design services - 71320000

    • Mechanical engineering services - 71333000

Location of contract

KW14 7TZ

Value of contract

£150,000 to £200,000

Procurement reference

CF-0022700D4L000000iAvzUAE

Published date

13 December 2022

Closing date

14 February 2023

Closing time

12pm

Contract start date

1 March 2023

Contract end date

31 March 2024

Contract type

Works

Procedure type

Other

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

D1206 AFC Structural Containment - Reserved to Caithness

Background

The D1206 active cell structure has installed primary/secondary filtration filters within a
structure at one end called the Active Filter Change (AFC). The AFC requires a robust
extension containment that will allow replacement and deployment of the new filter change
robot and other equipment to support filter change operations. The currently installed filter
change robot has failed and is non-functioning and the current set of filters require to be
changed due to the extended period they have been in service and any future potential
degradation if left unattended. Once the filters have been changed, decommissioning
within the cells can commence. The containment described in this document is only
required to support the replacement of the robot and associated tasks. Once the robot is
operational the containment will be removed.


Scope of the Contract

The scope of work defining the contract boundary is to take the concept/scheme design
information supplied and develop a detailed design to enable manufacture and testing of
a robust structural containment in accordance with technical procurement specification
D1206-P002-TPS(22)-001 Issue 1. The detailed design of the structural containment must
consider the scheme design information contained in the User Specification/Basis of
Design document D1206-P002-BoD(22)-001 and incorporate the design requirements as
listed in the Scheme Design Technical Requirements Document (D1206-P002-
TRD(22)01) Issue 2. The containment manufacture and testing must demonstrate the
design intent has been achieved in accordance with the detailed design requirements.
The scope of the contract is to complete the detailed design and to manufacture, test and
deliver to site a robust structural containment to enable active operations.