Published date: 8 January 2021

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 10 February 2020, 12pm

Contract summary

Industry

  • Metalworking - 45262670

Location of contract

London

Value of contract

£1

Procurement reference

C4A47740292

Published date

8 January 2021

Closing date

10 February 2020

Closing time

12pm

Contract start date

13 February 2020

Contract end date

24 February 2020

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
a. tunnels:
i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.
b. Worksites:
i. five main tunnel Worksites (drive and/or reception sites)
ii. 16 CSO Worksites
iii. two System modification Worksites Thames Tideway Tunnel
iv. works at Beckton Sewage Treatment works.

Section 4: Scope of Works

Supply only of 4no. Bulkheads highlighted in red the overhead drawing no.3350-BAMNU-HAMPS-450-CZ-DR- 200027

Hammersmith site has requirement for bulkheads that will close openings that have been cast into Wall A. Their primary function is to protect the Chamber as the Inlet Channel breaks through into the new structure. The rubber gaskets create a watertight seal to stop inlet channel sewage from entering the chamber, delaying its use as a live sewer and therefore maintaining a working environment that does not need monitoring or confined space procedures.

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
Hammersmith Site


More information

Previous notice about this procurement

Thames Tideway Tunnel - C405 Main Works West - Bulkheads (Hammersmith)

  • Opportunity
  • Published 4 February 2020

Links

Additional text

Hammersmith Site


Award information

Awarded date

13 February 2020

Contract start date

13 February 2020

Contract end date

24 February 2020

Total value of contract

£12,191

This contract was awarded to 1 supplier.

Address

Reference

None

Supplier is SME?

No

Supplier is VCSE?

No


About the buyer

Contact name

colin smith

Address

130 Wilton Road
London
SW1V1LQ
England

Telephone

07976181302

Email

colin.smith@tideway-west.london