Published date: 25 October 2021

Last edited date: 25 October 2021

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 2 July 2021, 5pm

Contract summary

Industry

  • Miscellaneous repair and maintenance services - 50800000

Location of contract

BN180RB

Value of contract

£0

Procurement reference

RFO/SEL1

Published date

25 October 2021

Closing date

2 July 2021

Closing time

5pm

Contract start date

5 November 2021

Contract end date

5 November 2022

Contract type

Works

Procedure type

Other: Not Advertised, by invitation only

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

This is not an invitation to tender but 'notice of award' only.
The award has been made in line with the Parish Council's Financial Regulations and Standing Orders, whereby the opportunity was made available only to a number of particular economic operators selected for that purpose and was not advertised elsewhere (in compliance with the Public Contracts Regulations 2015, article 110, paragraph 5).

Slindon Pond as an attenuation pond has a key role to play in effective flood management, through the retention of rainwater and controlled discharge of excess water through an outlet structure. Numerous incoming drainage pipes form part of the overall system.
The current construction of the system has a number of limitations which are increasingly impacting the pond's storage capacity, as well as restricting flows into the pond from the incoming drainage pipes. The incoming pipes primarily serve run off from the public highway.

Whilst routine maintenance work has been undertaken over the years, the removal of substantial layers of silt is now required to improve the capacity of the pond, coupled with material changes to the existing incoming/outgoing infrastructure, through engineering works. Numerous works have also been carried out by WSCC in the past to improve the highway drainage system but have proved largely ineffective.

The position has deteriorated such that significant flooding is occurring on the public highway in the vicinity of the pond with increasing frequency and also causing damage to the road surface.

The pond is around 850 metres square and is constrained by an embanked area and woodland to the south and Church Hill to the north.

Project Respond will address a ground water flood risk through both material changes to, and increasing the drainage capacity of, the existing infrastructure.
This will be achieved by -
• Removing a willow tree, where its extensive root system has infiltrated the inflow pipes.
• Increasing the capacity of the pond by dredging and de-silting, silt to be sent to a licensed waste management facility.
• Pond revetment and stabilising the banks adjacent to the northern bank, at the edge of the highway.
• Changes to incoming and outgoing pipe structures, delivered through material improvements to existing infrastructure and new infrastructure installations and builds.


Award information

Awarded date

13 October 2021

Contract start date

5 November 2021

Contract end date

5 November 2022

Total value of contract

£62,104.92

This contract was awarded to 1 supplier.

PHB (CONTRACTORS) HENFIELD LIMITED

Address

Henfield Road
BN6 9JJ
GB

Reference

Companies House number: 04007658

Value of contract

£62,104.92

Supplier is SME?

Yes

Supplier is VCSE?

No


About the buyer

Contact name

Sarah Linfield

Address

C/o Westward Cottage
Westward Lane, West Chiltington
PULBOROUGH West Sussex
RH202PA
England

Telephone

01798813391

Email

clerk@slindonparishcouncil.gov.uk

Website

https://www.slindonparishcouncil.gov.uk/operation-watershed/