Published date: 19 April 2023
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction work for bridges - 45221100
Location of contract
North East
Value of contract
£396,660
Procurement reference
C8135
Published date
19 April 2023
Closing date
20 September 2022
Closing time
12pm
Contract start date
17 April 2023
Contract end date
18 September 2023
Contract type
Works
Procedure type
Call-off from a framework agreement
A mini-competition or direct purchase from a pre-established framework agreement.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The Monkton Terrace Footbridges were constructed in circa 1974. They comprise two separate structures supporting public footpaths. Each bridge sits either side of the Network Rail bridge (masonry arch) which carries the main carriageway of Monkton Terrace.
The structures carry pedestrians and cyclists over two railway lines. The northern line is owned by Network Rail and carries goods traffic to and from the Shell Oil Refinery in Jarrow. The southern line is owned by Nexus Rail and forms part of the Pelaw to South Shields branch of the Tyne and Wear Metro.
Initial works
The following remedial works are proposed prior to commencing works on the East footbridge:
o Erect pedestrian diversion signs
o Prepare the site compound and secure the site
o Ensure that Nexus Metro rail possession and permits are in place
Main works
The following remedial works are proposed for both of the footbridges:
• Install rail protection measures to the footbridge.
• Removal of existing parapets and cutting down of the sockets to below the surface of the existing reinforced concrete plinth.
• Treating and repair of the voids within the concrete plinth, created from the removal of the parapet.
• Extension of the existing concrete plinth (from 200mm to 300mm) to accommodate the new parapet connection details.
• Installation of new surface mounted parapets, to both footbridges, which will be drilled and bolted down into the extended reinforced concrete upstand.
• The deck waterproofing system, joints and surfacing will also be replaced and repaired as part of these works.
• Miscellaneous maintenance repairs.
• The works are to be undertaken following the installation of edge protection, which will be undertaken during overnight possessions of the Nexus Rail lines. Further possessions will be required for:
o the re-pointing of the existing abutments and the removal of the edge protection.
Award information
Awarded date
31 March 2023
Contract start date
17 April 2023
Contract end date
18 September 2023
Total value of contract
£396,660
This contract was awarded to 1 supplier.
MELDRUM CONSTRUCTION SERVICES LIMITED
Address
Pantheon Building,Lancaster Road
GATESHEAD
Tyne And Wear
NE11 9JW
GBReference
Companies House number: 04250084
Value of contract
£396,660
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Contact name
Kevin Graham
Address
Town Hall,Westoe Road
SOUTH SHIELDS
NE332RL
England
Telephone
07484030491
Share this notice
Closing: 20 September 2022, 12pm