Published date: 19 April 2023

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 20 September 2022, 12pm

Contract summary

Industry

  • Construction work for bridges - 45221100

Location of contract

North East

Value of contract

£396,660

Procurement reference

C8135

Published date

19 April 2023

Closing date

20 September 2022

Closing time

12pm

Contract start date

17 April 2023

Contract end date

18 September 2023

Contract type

Works

Procedure type

Call-off from a framework agreement

A mini-competition or direct purchase from a pre-established framework agreement.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The Monkton Terrace Footbridges were constructed in circa 1974. They comprise two separate structures supporting public footpaths. Each bridge sits either side of the Network Rail bridge (masonry arch) which carries the main carriageway of Monkton Terrace.
The structures carry pedestrians and cyclists over two railway lines. The northern line is owned by Network Rail and carries goods traffic to and from the Shell Oil Refinery in Jarrow. The southern line is owned by Nexus Rail and forms part of the Pelaw to South Shields branch of the Tyne and Wear Metro.

Initial works
The following remedial works are proposed prior to commencing works on the East footbridge:
o Erect pedestrian diversion signs
o Prepare the site compound and secure the site
o Ensure that Nexus Metro rail possession and permits are in place
Main works
The following remedial works are proposed for both of the footbridges:
• Install rail protection measures to the footbridge.
• Removal of existing parapets and cutting down of the sockets to below the surface of the existing reinforced concrete plinth.
• Treating and repair of the voids within the concrete plinth, created from the removal of the parapet.
• Extension of the existing concrete plinth (from 200mm to 300mm) to accommodate the new parapet connection details.
• Installation of new surface mounted parapets, to both footbridges, which will be drilled and bolted down into the extended reinforced concrete upstand.
• The deck waterproofing system, joints and surfacing will also be replaced and repaired as part of these works.
• Miscellaneous maintenance repairs.
• The works are to be undertaken following the installation of edge protection, which will be undertaken during overnight possessions of the Nexus Rail lines. Further possessions will be required for:
o the re-pointing of the existing abutments and the removal of the edge protection.


Award information

Awarded date

31 March 2023

Contract start date

17 April 2023

Contract end date

18 September 2023

Total value of contract

£396,660

This contract was awarded to 1 supplier.

MELDRUM CONSTRUCTION SERVICES LIMITED

Address

Pantheon Building,Lancaster Road
GATESHEAD
Tyne And Wear
NE11 9JW
GB

Reference

Companies House number: 04250084

Value of contract

£396,660

Supplier is SME?

Yes

Supplier is VCSE?

No


About the buyer

Contact name

Kevin Graham

Address

Town Hall,Westoe Road
SOUTH SHIELDS
NE332RL
England

Telephone

07484030491

Email

kevin.graham@southtyneside.gov.uk