Published date: 16 September 2022
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Concrete - 44114000
Concrete products - 44114200
Reinforced-concrete structures - 45223500
Concrete work - 45262300
Reinforced-concrete work - 45262310
Location of contract
London
Value of contract
£2,500,000 to £5,000,000
Procurement reference
C4A57090920
Published date
16 September 2022
Closing date
10 August 2021
Closing time
11:45pm
Contract start date
4 July 2022
Contract end date
30 June 2023
Contract type
Supply contract
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The scope for this package is the supply of 571 no. precast reinforced-concrete noise barrier panels, which will form part of the noise barrier structure to be constructed along the north and south sides of the High Speed Two (HS2) trace at the West Ruislip retained embankment and the Gatemead embankment. The noise barrier structure will also be constructed across the River Pinn Underbridge (RPU) and the Breakspear Road Underbridge (BRSU) structures. The breakdown of the required number of precast reinforced-concrete noise barrier panels is as follows:
- Noise Barrier South Standard Panels: 248 no. c.5.60m-high precast reinforced-concrete noise barrier panels, with a c.30.60 deg. cranked edge commencing at roughly 2.30m high. Lengths are between 2.70m and 3.78m.
- Noise Barrier South Transition Zone Panels: 16 no. precast reinforced-concrete noise barrier panels, again with a cranked edge. Heights are between 6.19m and 6.37m, with lengths between 2.95m and 2.99m.
- Noise Barrier South Bridge Panels: 18 no. straight precast reinforced-concrete noise barrier panels (no cranked edge). Heights are between 5.73m and 7.00m, with lengths between 1.50m and 3.22m.
- Noise Barrier North Standard Panels: 253 no. c.3.10m-high straight precast reinforced-concrete noise barrier panels (no cranked edge). Lengths are between 2.59m and 3.04m.
- Noise Barrier North Transition Zone Panels: 18 no. straight precast reinforced-concrete noise barrier panels (no cranked edge). Heights are between 3.46m and 3.60m, with lengths between 2.97m and 3.00m.
- Noise Barrier North Bridge Panels: 18 no. straight precast reinforced-concrete noise barrier panels (no cranked edge). Heights are between 3.23m and 4.50m, with lengths between 1.50m and 3.22m.
The attached drawing provides a visual representation of the proposed noise barrier structure.
The goods are to include lifting points (hooks/eyes/etc.) and tie-in points for temporary works purposes.
The services are:
- production of shop drawings,
- design of the lifting and tie-in points,
- creation of the necessary moulds,
- fabrication/casting of the required precast reinforced-concrete noise barrier panels, and
- delivery to SCS JV's site and SCS JV's testing subcontractor's facilities (location TBC).
There may also be a requirement for storage space, depending upon the proposals for the noise barrier panels to be delivered on a just-in-time basis.
More information
Previous notice about this procurement
- Opportunity
- Published 30 July 2021
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=57090926
- Tender notice
- Please follow this link to view the notice.
Award information
Awarded date
31 August 2022
Contract start date
4 July 2022
Contract end date
30 June 2023
Total value of contract
£4,100,000
This contract was awarded to 1 supplier.
Explore Industrial Park
Address
Explore Way
Worksop
S803FDReference
None
Value of contract
£4,100,000
About the buyer
Contact name
Procurement Team
Address
Victoria House, Bloomsbury Square
London
WC1B 4DA
UK
Telephone
07392092055
Share this notice
Closing: 10 August 2021, 11:45pm