Published date: 30 April 2021

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 7 May 2021, 12pm

Contract summary

Industry

  • Construction work for tunnels - 45221240

  • Railway tunnel construction work - 45221242

  • Tunnelling works - 45221247

    • Footpath construction work - 45233161

Location of contract

United Kingdom, Isle of Man, Channel Islands

Value of contract

£10,000,000 to £20,000,000

Procurement reference

C4N55270446

Published date

30 April 2021

Closing date

7 May 2021

Closing time

12pm

Contract start date

8 November 2021

Contract end date

16 June 2025

Contract type

Works

Procedure type

Competitive quotation (below threshold)

The buyer selects a group of potential suppliers to invite to tender.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The current package of work involves the construction of the 4nr Chiltern Tunnels' porous portals. One porous portal is made up of 2nr 500m stamped concrete wall from 4.5 to 7.4m high and 1nr 500mm thick curved concrete roof (inner diameter of 4.55m). There is one 240m and one 160m long portal at each end of tunnel (16km apart). Specific formworks have to be designed and supplied, allowing portals realisation while TBMs are boring and supplied.
The package includes also the North Portal base slab (thickness 2m x 5700 m2), the South Portal base slab (2m x 2250 m2), the North break out preparation works, 2nr cross passages and concrete footpaths.
The successful Subcontractor will be expected to work and liaise in close proximity to the Main Contractor's TBM teams and other trades. Proposals will be required to include construction methodology, equipment selection, temporary works and any access arrangements to service the works. These works are planned to commence in November 2021 and will be completed by mid-2025.
Selection will depend upon the technical and commercial submission. Contractors will meet a high standard of health, safety, quality and environmental requirements.

The package will be competitively tendered and assessed against a split between commercial (price) and non-commercial/technical criteria - The intention of the Contractor that these works will be tendered as 1 enquiry, however we reserve the right to split the works and award the package to more than 1 sub-contractor - we do not anticipate this award being to more than 2 contractors.
In July 2017, ALIGN (Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick) won the significant C1 package of the UK High Speed 2 line (HS2). Lot C1 consists of 21.6km of high speed rail infrastructure in a rural environment. This will include a 3.37km viaduct, 15.75km twin-tubes tunnel and five vent shafts handling both piston effect and tunnel ventilation.


More information

Links


About the buyer

Contact name

Olivia Whaley

Address

Euston House, 24 Eversholt Street
London
NW1 1AD
England

Telephone

01698647999

Email

e.thanopoulou@alignjv.com