Published date: 8 February 2016

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 22 March 2016

Contract summary

Industry

  • Construction work - 45000000

  • Architectural, construction, engineering and inspection services - 71000000

Location of contract

Any region

Value of contract

£0

Procurement reference

ENRD-00052

Published date

8 February 2016

Closing date

22 March 2016

Contract start date

4 April 2016

Contract end date

3 April 2017

Contract type

Supply contract

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

To carry out the necessary surveys and prepare engineering designs for the R2 project. The R2 project is the widening, re-grading and re-alignment of a 3000m stretch of road from the brow, Jamestown to Ruperts in accordance with the attached design criteria. The consultant shall prepare a detailed conceptual design for Saint Helena Government to be used as a basis of the procurement of a contractor to undertake the works.

The consultant shall perform all the work necessary to achieve the objectives of the assignment and shall at all times utilize the most economical, effective and widely accepted engineering concepts in this work.
In carrying out the work the consultant shall co-operate with Saint Helena Government and in particular with the R2 Project Board which will administer the construction contract and the Roads department of the Environment and Natural Resources Directorate.

Using Method of Measurement for Highway Works Volume IV. The detailed engineering design shall be presented to a degree of accuracy that will enable quantities of principal items of construction materials to be estimated.
Such principal items shall include: earth work, earth work cut and fill, sub-base materials, surfacing materials, drainage structures, retaining structures and vehicle restraining systems.
The consultant will be aware that the contractor will be expected to deliver the project within 9 calendar months from award of contract.

Over and above the the design element the consultant will be asked for a proposal for the project management of the delivery of the works.


More information

Attachments

Additional text

Additional Photos to be provided by request to Noleen Herne.


About the buyer

Contact name

Noleen Herne

Address

The Castle, Jamestown, St Helena, South Atlantic Ocean STHL 1ZZ
Jamestown
STHL 1ZZ
England

Email

noleen.herne@sainthelena.gov.sh

Website

http://www.sainthelena.gov.sh/