Published date: 19 July 2024

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 26 July 2024, 11:20am

Contract summary

Industry

  • Piling - 44212400

  • Sheet piling - 44212410

Location of contract

London

Value of contract

£1,000,000 to £2,500,000

Procurement reference

C4N82631911

Published date

19 July 2024

Closing date

26 July 2024

Closing time

11:20am

Contract start date

20 January 2025

Contract end date

30 June 2028

Contract type

Works

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP13.1-Urban Realm Civils, Utilities and Earthworks. Part of this scope requires the installation of permanent sheet piles, extraction of existing sheet piles, installation and extraction of temporary works sheet piles.

There is an interface with Transport for London (TfL) assets on the Northern boundary and the subcontractor will be working under a controlled working environment (ALO) and in the case of the permanent piles within Tfl land. The extraction of the existing sheet piles are within the HS2 OOC site and interfaces with overhead lines to the East and fall within the rail interface zone. Experience of working in the rail environment and a proven ability to develop methodology collaboratively around this key interface, produce works package plans and operate in a rail environment is a prerequisite of being considered for these works.

Permanent Sheet Piles 12m long, S355 Arcelor AZ(20-700) sheet pile, or similar.
Extraction Piles 260m of EZ19-700 GRADE S355. 10 to 12m depth.

To the South there is a requirement for temporary sheet piles to allow construction of the permanent RC Attenuation Tanks. This will require numerous visits to install and remove as construction is split into two phase. These works do not fall with the zones of influence of the operational railway.

Temporary Sheet Piles GU21 sheet piles or similar 8m and 12m

Installation of sheet pile are to commence Q1 2025 and will require numerous visits to complete in late Q1 2027.


More information

Links


About the buyer

Contact name

Clare Llewellyn

Address

McDermott House, South Crescent
London
E164TL
UK

Telephone

07933529243

Email

supplychain@kilnbridge.com