  • Drinking-water treatment plant construction work - 45252126

  • Repair and maintenance of plant - 45259000

Location of contract

West Midlands

Value of contract

£0

Procurement reference

BCH/3776/RF/16

Published date

23 November 2016

Closing date

13 December 2016

Contract start date

1 February 2017

Contract end date

30 April 2017

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Upgrading existing water treatment plant: the existing water treatment plant & the display unit are to be replaced & upgraded. The installation and replacement works in line with the upgrade shall be carried out by the supplier of the 'Orca' system ProEconomy.
BMS connection of Water treatment System. - Connection of the Copper Silver system with the Hospital's central BMS system in order for the Service engineer to have a full information and visualization of the system's performance at all times, giving him the capability to intervene if needed. Improvement of Water Treatment Service procedure and time. - Examination and redesign of the system for better possible work order or output.
Pipe Flood Detection System. - Examine, propose and design better fail safe mechanisms to prevent flooding due to future pipe failure. Backup of the Electrical Actuator Cut off Valve. The Electrical Actuator Cut Off Valve The system must always : be in good Working Order, have ability to work at all times, be available for Cut off at all times, which makes it a far too important a mechanism to be left without a backup.
Water Temperature Reading. Install a system for reading and recording the temperature of the incoming water into the Copper Silver Disinfection system and introduce that data into the BMS.
Sump Pump System, improve and secure working order. - Provide a clean Sump-pit for pumps to work without damage. Examine, propose and redesign the Sump Pump system with better fail safe mechanisms to prevent flooding due to future pipe failure.


More information

Additional text

Please be aware that Birmingham Children's Hospital has a tender opportunity for Water Treatment and Sump Pump Upgrade works.

The tender documentation can be accessed via Bravo Solutions (no documents will be sent direct from the Trust), the ITT reference and contact details are below:

ITT: itt_3775 - Water Treatment and Pump System Upgrade Running
Project - 20592

HELPDESK
Need assistance?
Please contact our Sourcing helpdesk:
Phone: 0800 368 4850
E-mail: help@bravosolution.co.uk


Any difficulties ring accessing please contact the helpdesk and they will be able to help you.


About the buyer

Address

Steelhouse Lane
Birmingham
B4 6NH
England

Email

rachel.fanthom@bch.nnhs.uk