Published date: 5 September 2018
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Canoes - 34522550
Construction work of leisure facilities - 45212100
Recreation installation - 45212140
Multi-purpose sports facilities construction work - 45212220
Location of contract
TA10 9PR
Value of contract
£40,000
Procurement reference
The Langport River Project - LOT 1 - Riverside Pontoons
Published date
5 September 2018
Closing date
21 September 2018
Contract start date
1 April 2019
Contract end date
30 November 2019
Contract type
Supply contract
Procedure type
Single tender action (below threshold)
A direct contract with a single supplier, without competition.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The Langport River Project
LOT 1 - Riverside Pontoons - Specification for Tender
Background Information
At Langport, the River Parrett is in its 'mature stage', meandering through a flat wetland landscape - the Somerset Levels. Shortly before reaching Langport it is joined by its tributaries, the Rivers Yeo and Isle, together drain an area of over 750 km sq.
The river, at Langport, is considered to be non-tidal but opinions on this vary. Nonetheless, the river experiences significant rise and fall some of which are generated through local flood management and others through the volume of rainfall upstream. The area can experience variation of water levels at any time of the year.
The Product and Materials:
6m x 2m pontoon, recycled plastic with hand rails to the shore edge, toe rails to the front and sides, a drop down emergency ladder, security anchor, 6m x 1.5m gangway and either a pile mooring or a stiff arm mooring - Cocklemoor Point B (ST 41922 26577) and Blackbridge car park Point H (ST 42456 26303).
3m x 2m pontoon, recycled plastic with hand rails to the shore edge, toe rails to the front and sides, a drop down emergency ladder, security anchor, 6m x 1.5m gangway and either a pile mooring or stiff arm mooring for Cocklemoor Point C (ST 41570 26619) and Muchelney Point J (ST 42496 24837).
Mooring Piles
The mooring piles will be driven into the riverbed using a petrol vibrating post driver access by a small scaffold tower.
Summary:
You should note that this project is subject to a successful outcome to a Rural Development Growth Fund Grant application.
All items to be supplied, delivered and installed to Langport, Somerset TA10 - full details to be provided with order.
All quotations must be addressed to:
Langport Town Council
Town Hall
Bow Street
Langport
Somerset
TA10 9PR
Quoting - The Langport River Project, LOT 1 - Riverside Pontoons
Email submissions are accepted.
About the buyer
Contact name
David Mears
Address
Bow Street
LANGPORT
TA109PR
England
Telephone
01458259700
Website
Share this notice
Closing: 21 September 2018