Published date: 16 October 2025
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Surface work for highways - 45233210
Location of contract
North East
Value of contract
£231,185.88
Procurement reference
tender_509303/1524945
Published date
16 October 2025
Closing date
3 June 2025
Closing time
3pm
Contract start date
4 June 2025
Contract end date
1 September 2025
Contract type
Works
Procedure type
Call-off from a framework agreement
A mini-competition or direct purchase from a pre-established framework agreement.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
A63 Western IC EB Entry Slip Road - 2000A63/443 (0.755km long)
This is a single lane slip road which leads off the A15 SB. Records indicate this slip road was resurfaced in 2016 with some previous deeper targeted inlays
completed in 2008.
The current defects include surface course deterioration, joint deterioration and cracking. Some defects are present in the local authority owned section, 10m prior to the start of the slip road - the scheme has been extended to incorporate these defects. There are currently no concerns with regards to texture however, between Ch.0m and 150m SCRIM is as low as -.005. There are two isolated areas of rutting at 11.5mm and TSD Cat 3 has been recorded between Ch.0m and 150m. Deflectograph data is not currently available. Wholescale inlays of 90mm deep are proposed for the entire length of the slip road. This approach acknowledges the core findings and Cat 3 TSD readings however, there are no significant structural failures and this depth is deemed appropriate given the visual defects. The only other option would be to go much deeper (full depth reconstruction) and the low traffic figures and type of defects do not
justify this.
The chevron area between the slip road and mainline is to be resurfaced. The existing drainage channels are to be replaced as they are life-expired and difficult to maintain. It should be noted that slot drainage now requires a departure from standards, refer to Appendix G for alternative drainage system to be used. Additional information/survey data to be passed onto the Detail Designer as soon as it becomes available. The full extents of the slip road should be renewed - extend into lane 1 (full width) if necessary to ensure the narrow end is fully renewed.
There are no structures affected by this scheme. Loops have not been identified within the scheme extent
Award information
Awarded date
28 April 2025
Contract start date
4 June 2025
Contract end date
1 September 2025
Total value of contract
£231,185.88
This contract was awarded to 1 supplier.
DSD CONSTRUCTION LIMITED
Address
Dsd House Dukes Drive, Kingmoor Park North, Carlisle, England, CA6 4SH
Reference
Companies House number: 02818677
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Address
Three Snowhill
Birmingham
B4 6GA
England
Share this notice
Closing: 3 June 2025, 3pm
All content is available under the
