Published date: 20 August 2024

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 27 August 2024, 4pm

Contract summary

Industry

  • Pipes - 44163100

  • Drainage pipes - 44163110

  • Drain pipes - 44163111

    • Pipe fittings - 44163200

    • Pipe clamps - 44163210

    • Pipe connectors - 44163230

    • Pipe joints - 44163240

    • Various pipe fittings - 44167000

Location of contract

Any region

Value of contract

£250,000 to £500,000

Procurement reference

C4N81813935

Published date

20 August 2024

Closing date

27 August 2024

Closing time

4pm

Contract start date

16 September 2024

Contract end date

27 June 2025

Contract type

Works

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The Sub-subcontractor shall allow to install a complete and compliant Public Health installation to the project specifications including (but not limited to) the following:

• All internal copper pipework and ensign drainage cast iron pipework shown on the 2D drawings. All Foul and wastewater drainage, cavity drainage, condenses, tank over flows and all potable and non-potable water to and from the free issued CAT 5 booster tank, this includes isolation valves and non-return valves to the approved Material Compliance MCR.
• All vents and rodding points.
• MCWS pipework and its Valves. (Above ground)
• Installation of all sanitary assets, Electric water heaters, Water meters and scale inhibitor as per approved MCR. All hot and cold systems.
• All pumped drainage pipework shown on the 2D drawings from the header to all relevant manholes.
• All support systems and fixings required to support the pipework in all locations including risers, rooms, corridors, and outside areas.
• All support systems and fixings required to support the pipework. Supports shall be installed to correct spacings or less, as determined by the pipework calculations.
• All Unistrut, drops rods and other materials required to construct brackets and supports are required to be installed to the approved MCR.
• Installation check sheets shall be completed by the Sub-subcontractor.


More information

Links


About the buyer

Contact name

Maryam Abdussalam

Address

25 Camperdown Street
London
E18DZ
UK

Telephone

+447500440686

Email

maryamabdussalam@phoenixme.co.uk