Published date: 13 August 2025
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Construction work - 45000000
Location of contract
South East
Value of contract
£10,000,000 to £20,000,000
Procurement reference
C4N97987264
Published date
13 August 2025
Closing date
15 August 2025
Closing time
4pm
Contract start date
29 January 2026
Contract end date
4 June 2027
Contract type
Works
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
"The main contracted works is for the construction of a new overbridge (Marston Road Overbridge) to facilitate the decommissioning of the current Marston Road Level Crossing. The Level Crossing is situated on the Bletchley and Bedford Midland Line (BBM) @ 9m 02ch.
The scope of the works is the construction of the new bridge and assosciated works as per the current Form 2 Design.
Works involve but not limited to the following:
The works to be carried out include but not limited to the list below:
1. Consultation with stakeholders to agree the level of welfare provision, access arrangements, service diversions and other works necessary to enable commencement of the works.
2. Undertaking of enabling works to create a worksite suitable for the works.
3. Temporary Works development to enable permanent works construction.
4. Installation of the new drainage ditch either side of the new highway. Pipework, chambers, under track crossing, and headwall structures for the underground culvert diversion on the East side of the existing road alignment.
5. Construction of the piled foundation & pile caps either side of the railway lines to support the installation of the new abutment, wingwalls and restraint barriers.
6. Construction of the bridge abutments, cills and wingwalls.
7. Procurement and fabrication of beams, approach units, bearings, parapet, waterproofing and surfacing of the of the new bridge structure.
8. Installation of approach embankments to the abutments with engineered material combined with the installation of deck drainage and highway drainage to outfall.
9. Construction of the embankment slopes and ancillary highway infrastructure including carriageway, white lining, verges, tie-ins, footpaths, approach safety barriers, fencing and service ducting from Chainage 10m to Chainage 540m as per Form F (180940-MUR-ZZ-XX-DRG-EHW-000).
10. Diversion and reinstallation of the Statutory Services (Anglian Water, Cadent Gas, UK Power Network, Openreach (BT)) in the new highway overbridge infrastructure.
11. Installation of cable troughs, and chambers on under track crossings for systems cabling.
12. Telecommunications related modification works.
13. E & P related modification & installation works.
14. Signalling related modification works.
15. De-vegetation and landscaping works as per the ecological and landscape design documentation.
The stating date for the Main Contract Works was [insert] and the completion date for the whole of the Main Contract Works is [insert] "
More information
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=97987266
- Tender notice
- Please follow this link to view the notice.
About the buyer
Contact name
Louise Appleton
Address
Hiview House, Highgate Road
London
NW51TN
UK
Telephone
07594514782
Share this notice
Closing: 15 August 2025, 4pm