Published date: 5 January 2024
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Ground-drainage work - 45111240
Drainage construction works - 45232450
Drainage and surface works - 45232451
Location of contract
South East
Value of contract
£50,000 to £60,000
Procurement reference
Drainage Works Framework 2023 - Mini Competition - Fir Tree Road, Tunbridge Wells Scheme
Published date
5 January 2024
Closing date
13 November 2023
Closing time
12pm
Contract start date
29 January 2024
Contract end date
4 March 2024
Contract type
Works
Procedure type
Call-off from a framework agreement
A mini-competition or direct purchase from a pre-established framework agreement.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The Drainage Works Framework 2023 (SC22331) is used to support Kent County Council's current contracts (Highway Term Maintenance Contract, Road Asset Renewal Contract and others) to maintain it network.
The drainage works consist of the provision of labour, resources, plant and materials to carry out all works associated with drainage maintenance works and general reinstatement works on both highway and non-highway sites.
Works under £25k are awarded via direct award on a rotation basis.
Works over £25k are awarded via a mini-competition process.
This notice pertains to a mini-competition exercise that was carried out under the Drainage Works Framework 2023.
Details of this mini-competition are below listed below:
- Aim: to find a Contractor to deliver the Fir Tree Road Tunbridge Wells scheme.
- Dates: The scheme needs to be delivered between the 29 January 2024 to 04 March 2024.
- The scheme will deliver the following outputs, please note that this is not an exclusive list:
• Road closure, advanced warning signs, and letter drops.
• To carry out two trial hole trenches across the full width of the carriageway.
• To replace three existing gullies with new 450mm x 900mm gully pots, and to also install another four new 450mm
x 900mm gully pots.
• To install two new Type 2a chambers in the carriageway.
• To install a new 2.4m dia, 4m deep Type 1 Soakaway (conventional) on the verge of the Commons to KCC
standard. Before excavating for the soakaway, the existing turf is to be cut out, rolled up and set aside for re-use.
Some of the best of the soil is also to be set aside for reinstating.
• To install a total of 49m. new 225mm Twinwall pipe at various locations within the carriageway.
• To install a total of 41.45m of new 150mm Twinwall pipe from the gullies to the new chambers and from the gullies
to the new 225mm and 150mm pipes as indicated on the plans.
• The existing drainage pipe from existing gully to gully crossing the junction of Fir Tree Rd is the be sealed up at
end when the gully is replaced.
• To reinstate the trenches of the Type 4 carriageway to KCC standard detail
Award information
Awarded date
12 December 2023
Contract start date
29 January 2024
Contract end date
4 March 2024
Total value of contract
£55,000
This contract was awarded to 1 supplier.
Ferns Surfacing Limited
Address
Tutsham,
West Farliegh,
Maidstone,
Kent
ME15 0NEReference
Companies House number: 03193093
Value of contract
£55,000
Supplier is SME?
Yes
Supplier is VCSE?
No
Share this notice
Closing: 13 November 2023, 12pm