Published date: 2 August 2024
Last edited date: 2 August 2024
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction work - 45000000
Location of contract
NR4 7TJ
Value of contract
£0 to £87,983,160.82
Procurement reference
IT-37-845-PURCON2023 - AWARD
Published date
2 August 2024
Closing date
6 December 2023
Closing time
12pm
Contract start date
24 July 2024
Contract end date
14 January 2027
Contract type
Works
Procedure type
Other
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
The University of East Anglia was created during the 1960s. Its original campus buildings were designed by the acclaimed architect Sir Denys Lasdun and several of the original buildings are now Grade II Listed, including the original teaching and science building the Lasdun Wall. The Grade II listed Lasdun Wall is an iconic and important part of University of East Anglia's (UEA) history situated in the centre of the UEA's vibrant and busy 24/7 campus. However, the building needs repair and refurbishment to address condition issues and to deliver essential sustainability improvements to enable the University to meet their target to be a net zero campus by 2045. The Lasdun Wall comprises four buildings constructed to appear as one (Building 3, Building 4, Building 5 and Building 6). The University plans to carry out a four-phase strip-back-to-frame refurbishment of the Lasdun Wall. This project - Lasdun Wall Refurbishment Phase 1 - will deliver new modern science facilities and teaching space in an extended Building 3, whilst existing science research facilities continue to operate within Buildings 4, 5 and 6. The existing science facilities are currently at risk due to potential condition failures of the buildings, therefore the success of Phase 1 to 'de-risk' highly specialised facilities within the Lasdun wall, is of extreme importance to the University.
The University's Phase 1 project consists of three elements
Preliminary enabling works (by others)
The Main Works (the subject of this procurement)
A package of interphase enabling works which will complete Phase 1 and prepare for the future decommissioning of Buildings
The appointed Main Contractor will be required to undertake the following:
Initial phase of strip out and asbestos removal will have been undertaken to provide an empty shell, however asbestos removal will be required by the main contractor as follows:
Facades - Around existing windows which will be replaced, and concrete façade panels removed to accommodate the new extension.
Existing floor screed abutting the perimeter which includes asbestos contamination around existing fixings to the retained listed concrete façade panels - fixings and all remaining screeds will need to be removed.
Within the tender design information, we have included the Asbestos survey report to support with the remaining asbestos removal, sequencing and overall methodology. All Asbestos must be removed.
Extension - An extension of approx. 2,966m² is planned to one elevation.
Window Replacement and Façade Treatment - The building is listed and the facades are a sensitive architectural feature which will need to be carefully replaced with modern windows in similar style.
Fitting Out of existing building - The re-fit comprises circa 11,287m² of space split to include science research facilities and teaching and social learning space.
External Works as detailed in the ISIT design i...
Award information
Awarded date
24 July 2024
Contract start date
24 July 2024
Contract end date
14 January 2027
Total value of contract
£87,983,160.82
This contract was awarded to 1 supplier.
Mace
Address
155 Moorgate, London, United Kingdom, EC2M 6XB
Reference
None
About the buyer
Contact name
Claire Woodcroft
Address
University of East Anglia
Norwich Research Park
Norwich
NR4 7TJ
United Kingdom
Telephone
01603 592728
Share this notice
Closing: 6 December 2023, 12pm