Published date: 7 December 2018
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Electrical machinery, apparatus, equipment and consumables; lighting - 31000000
Location of contract
SP4 0JG
Value of contract
£0
Procurement reference
tender_194252/731214
Published date
7 December 2018
Closing date
3 December 2018
Contract start date
19 December 2018
Contract end date
18 November 2019
Contract type
Works
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
The main building (01) electrical busbar system and parts of its distribution system has been in place for over 50 years and is in need of statutory testing and maintenance. Although currently safe to operate, there is a need to carry out testing on the Busbar, associated cabling (including testing of new Acti boards already fitted) and replace obsolete distribution boards within the service floor and basement.
In broad terms, the scope of this project is to carry out a series of tests on the existing Busbar and downstream circuits, replace all existing obsolete MEM distribution boards with Isobar Schneider Acti 9, replace the Lecture Theatre (LT) LV switch-board main isolating switch with a new Air Circuit Breaker (ACB) and carry out LV maintenance on LT LV switchgear.
The contractor is to be supply all parts, plant, equipment and labour required to carry out the works.
Provide and manage all generator back up as required. To be demonstrated at tender stage.
Provide all contingency in the event of power no being able to be restored in any area as required. To be demonstrated at tender stage.
Pre-work surveys must be carried out by the contractor to satisfy themselves of the scope.
Issue of all test certification, update, O&M's, H&S File on completion of each zone.
The contractor will act in the role of PC and PD if required.
The works will take place during week long shut-downs, January - September 2019, corresponding to an area of the main busbar.
The technical specifications are contained within the attachment section on the PHE.Bravo portal and are listed below:
1. PHE- PD- WI-170381
2. PHE-PD-URS-170381-Power Distribution Boards Oct 2018 - Draft
3. Pre-construction info pack Power Distribution Boards_
There are also other relevant documents that have been included within the attachment section of the Bravo e-tendering portal ITT form for information and these will require referencing to submit a full response.
More information
Links
-
- https://phe.bravosolution.co.uk
- Tender notice
- Procurement Documentation
Additional text
-
To view and apply for this opportunity you will need to be registered or to register with PHE.Bravo
Award information
Awarded date
7 December 2018
Contract start date
7 December 2018
Contract end date
6 December 2019
Total value of contract
£662,000
This contract was awarded to 1 supplier.
SSE Contracting Ltd
Address
1 Forbury Place 43 Forbury Road Reading RG1 3JH
Reference
None
Supplier is SME?
No
Supplier is VCSE?
No
Share this notice
Closing: 3 December 2018
All content is available under the
