Published date: 9 June 2017

Last edited date: 9 June 2017

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 27 June 2017

Contract summary

Industry

  • Repair and maintenance services of building installations - 50700000

Location of contract

WR5 2NP

Value of contract

£7,000 to £10,000

Procurement reference

SYSTEM 00000230

Published date

9 June 2017

Closing date

27 June 2017

Contract start date

10 July 2017

Contract end date

31 August 2017

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Place Partnership Ltd. on behalf of Worcestershire County Council invite suitable, qualified and licensed Asbestos removal Contractors to carry the removal of Asbestos Containing Materials from boiler houses / plant rooms at the following 2 sites: (i) Sebright Building (ii) Woodfield Building both at Wolverley CofE Secondary School Blakeshall Lane Wolverley Kidderminster Worcestershire DY11 5XQ

Asbestos Containing Materials (ACM's) have been identified within the Boiler Room.

The Licensed Contractor is expected to:
Pre clean and sheet out all 'non cleanable' items to avoid contamination
Remove the dust / debris to the floor throughout the Boiler Room
Clean, and remove any visible residues, to the bare pipework without removing the modern lagging or aluminium casing from the pipes (possible residues below this is to be remain in situ by design).
Any exposed MMMF insulation to the pipework will need to be repaired using wipe-able foil tape.
Remove visible residues, bumps and lumps from the walls and ceiling
Environmentally clean all wipe-able surfaces within the Boiler Room free of all dust and debris
The Four Stage Clearance procedure will commence. A satisfactory thorough visual examination of the Boiler Room must be undertaken by the Tersus Analyst prior to any encapsulation works (if necessary)

Following the removal of the above using industry best practices, and by adhering to the robust Method Statement submitted to the HSE by the LARC, and after the Licensed Contractors Site Supervisor has undertaken his thorough visual to check completeness and is satisfied, the enclosure will be handed to the Tersus analyst for a four stage clearance and associated clearance air testing with a brush disturbance.

A competent and trained analyst, of Tersus Consultancy, on behalf of Place Partnership will be involved in the abatement works with the aim to safely reoccupy the Boiler Room as a safe environment. They will also clearly convey on the Certificate of Reoccupation (CoR) all relevant information in terms of what works have / have not taken place within the Boiler Room, where has / has not been thoroughly inspected during the four stage clearance procedure and what ACM's have been removed and what ACM's are to remain by design.

To arrange a Site Visit please contact: Wolverley CE Secondary School 01562 859800 or site@wolverley.worcs.sch.uk

Worcestershire County Council reserve the right not to award a contract in full or in part.


More information

Links

Additional text

Is a Recurrent Procurement Type? : No


About the buyer

Contact name

Kim James

Address

Spetchley Road
Worcester
Worcestershire
WR5 2NP
United Kingdom

Telephone

01905 673190

Email

kim.james@placepartnership.co.uk