Published date: 26 January 2021
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction work - 45000000
Location of contract
East Midlands
Value of contract
£185,000
Procurement reference
NHSULH-DN510503-66472542
Published date
26 January 2021
Closing date
22 December 2020
Closing time
12pm
Contract start date
3 March 2021
Contract end date
28 February 2022
Contract type
Works
Procedure type
Restricted procedure
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Lincolnshire Partnership NHS Foundation Trust seek a Contractor for the demolition of a former Mental Health hospital, Norton Lea. The site comprises of a former Mental Health Hospital Site, known as 'Norton Lee'; site extends to approx. 2.16 hectares (5.34 acres) and has a range of one and two story buildings situated on it, that have been disused for a number of years and are in a poor state of repair. Vehicular access into the site is off London Road on its northern boundary.
All structures are to be demolished down to ground level. All above ground services are to be removed. Demolition of all hard standing surfaces (including reinforced concrete slab, mass concrete, tarmacadam and excavation of a minimum of 500mm below existing ground levels. Removal of all below ground foundations, hardcore, blinding concrete and obstructions (including below ground tanks, interceptors, and associated pipework and chasing out of services.
Asbestos removal is not to be included within the scope of works. Due to site limitations, full internal access is restricted, we are therefore unable to provide a full R&D Survey at this time. Any Asbestos removal shall be carried out by a Contractor licensed by the Health and Safety Executive (HSE) and prior to any other works starting in these buildings/ structures or immediately adjacent areas. Method statements are to be submitted to the Project Manager for comment 7-days prior to any works beginning on site and all removal works are to be in accordance with the requirements of the HSE. Any suspected Asbestos based materials discovered during demolition work which are not included within the Asbestos surveys, must be reported immediately to the Project Manager. All efforts must be made to avoid disturbing such materials.
Award information
Awarded date
26 January 2021
Contract start date
1 March 2021
Contract end date
28 February 2022
Total value of contract
£185,000
This contract was awarded to 1 supplier.
DSM Demolition Limited
Address
Arden House, Arden Road, Heartlands, Birmingham, B8 1DE
Reference
None
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Contact name
Lucy Reed
Address
Beech House
Waterside South
Lincoln
LN5 7JH
England
Telephone
+44 1522307406
Website
Share this notice
Closing: 22 December 2020, 12pm