Published date: 2 August 2023

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 30 August 2023, 12pm

Contract summary

Industry

  • Assembly of metal structures - 45223100

  • Installation of metal structures - 45223110

  • Structural steelworks - 45223210

    • Structural steel erection work - 45262400

    • Structural steel erection work for buildings - 45262410

    • Structural steel erection work for structures - 45262420

    • Metalworking - 45262670

    • Glazing work - 45441000

Location of contract

London

Value of contract

£5,000,000 to £10,000,000

Procurement reference

C4N72901984

Published date

2 August 2023

Closing date

30 August 2023

Closing time

12pm

Contract start date

27 May 2025

Contract end date

31 July 2029

Contract type

Works

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

WP12.5 Architectural Metalwork

Scope of work:
OOC HS2 Station Architectural Metalwork Package (WP12.5) consists of the design for construction and manufacture, supply, installation and assurance of architectural metalwork to the front of house HS2 Station areas, the Great Western Main Line/ Conventional Station (GWML) and Shared Accommodation Building (SAB). The scope of this package includes the following key elements:
• Steel and glazed balustrades, with integrated lighting.
• Timber handrails, with integrated lighting.
• Platform barriers.
• Lighting columns and armatures.

Key deliverables will be:
• Design Development: Prepare the design for construction and manufacture of architectural metalwork, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necessary interface and connection details, structural elements and ancillary elements to meet the prescribed performance requirements.
• Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards.
• Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for the installation of architectural metalwork in accordance with the approved design.
• Assurance and Certification: Generate and supply comprehensive assurance documentation for architectural metalwork installations, including testing as required.
• Coordination: Ensure coordination of architectural metalwork installations with various substrates, and other finishes to achieve integration within the overall project.

By executing the works diligently and adhering to the prescribed specifications, our aim is to deliver a high-quality architectural metalwork package that meets the requirements and contributes to the success of the Old Oak Common HS2 Station project.

About the buyer's selection process:
Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.

The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.

What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment).

About the buyer:
In 2018, Balfour Beatty, VINCI and SYSTRA (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common.

BBVS are committed to delivering this project to align with the key principles of Integrity, Leadership, Respect & Safety.


More information

Links

Additional text

No Documentation is included at this point.