Published date: 12 December 2017
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
River regulation and flood control works - 45246000
Environmental improvement works - 45262640
Restoration work - 45454100
Location of contract
North West
Value of contract
£10,959
Procurement reference
tender_159727/638443
Published date
12 December 2017
Closing date
20 November 2017
Contract start date
30 November 2017
Contract end date
31 March 2018
Contract type
Works
Procedure type
Restricted procedure
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
Goss Moor National Nature Reserve (NNR), which comprises Goss and Tregoss Moors, is a large flat valley basin which forms the headwaters of the River Fal in Cornwall. The NNR is managed by Natural England's Devon, Cornwall and Isles of Scilly Area Team. The NNR is the largest remaining remnant of a once much greater area of wilderness stretching across mid- Cornwall. It contains areas of dry and wet heath, mire, fen and open water, and a diverse mix of wildlife habitats. The reserve's range of habitats and species has resulted in its being designated a Site of Special Scientific Interest, National Nature Reserve and a Special Area of Conservation.
Past ditching works and the 'canalisation' of the eastern section of the River Fal accelerate the movement of water across the site resulting in a surface drawdown in some areas. In 2011 a project to restore a 500 metre stretch of the River Fal at Tregoss was completed, this saw the river diverted out of its canalised channel onto the flood plain into a channel which encompasses a newly constructed shallow channel and sections of historic meanders. Further hydrological restoration in the form of naturalising flows in ditches and canalised river channels, and blocking much smaller drains is desirable. Such restoration will raise water tables and increase wetland habitat, this work will also enhance Goss Moor's role in regulating river levels therefore managing flood events on the River Fal.
The required works will take place on the main River Fal channel (non EA) and two tributary channels of the River Fal.
The requirement is to:
- Install current deflectors into the River Fal channel to encourage and speed up the creation of meanders to increase channel length and therefore retention time within the River Fal on Goss Moor.
- Install leaky woody dams into the two tributary channels which will raise water levels to reduce the drawdown effect of the channels on the surrounding fen, while still allowing passage of wate
More information
Previous notice about this procurement
Peatland Hydrological Restoration Project on Goss Moor National Nature Reserve
- Opportunity
- Published 27 November 2017
Additional text
-
Please note that Defra procurement uses e-tendering, provided by Bravosolutions. In order to access the Bravo system you will need to be registered.
Could I therefore request that you register on the Bravo portal for Defra.
If you're already registered on the Bravo portal please check that your registration includes Defra, as you have to specify us in order to correctly receive the tender documents.
If you have any problems with the registration process, please contact the Bravo helpline on 0800 368 4850 or alternatively email them at help@bravosolution.co.uk. The link you require for new registration/amendments to registrations is -
https://defra.bravosolution.co.uk
Award information
Awarded date
29 November 2017
Contract start date
30 November 2017
Contract end date
31 March 2018
Total value of contract
£37,000
This contract was awarded to 1 supplier.
OpenSpace (Cumbria) Ltd
Address
The Stables, Great Orton, Carlisle, CA5 6NA, United Kingdom
Reference
None
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Address
Natural England
Peterborough
PE1 1NG
England
Share this notice