Published date: 21 November 2022
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Concrete - 44114000
Shutters - 44221400
Installation of shutters - 45421142
Location of contract
London
Value of contract
£250,000 to £500,000
Procurement reference
C4A57308185
Published date
21 November 2022
Closing date
17 August 2021
Closing time
12pm
Contract start date
8 August 2022
Contract end date
19 December 2022
Contract type
Works
Procedure type
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
a. tunnels:
i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.
b. Worksites:
i. five main tunnel Worksites (drive and/or reception sites)
ii. 16 CSO Worksites
iii. two System modification Worksites Thames Tideway Tunnel
iv. works at Beckton Sewage Treatment works.
Scope of the subcontract works:
Specific requirements
BMBJV (Contractor) require a specialist Subcontractor to undertake the construction of the shaft secondary lining slipform works, Price to be based on the following scope information found here within:
Construction Details
The shaft slipform details are
• Wall thickness is 600 mm thick.
• Slipform will commence at +61.797m
• Slipform will complete at +92.155m
• Shaft dia pre slipform 26.225m
• Shaft dia post slipform 25.025m (0/-25mm)
Included within the scope BMB also require the design, supply, operate, supervise, assembly and disassembly of sliding formwork including costs of steel shutter, decks, specialist equipment and all necessary specialist engineering and operating staff to complete the works. Also include for method of placement of concrete and all associated equipment required.
More information
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=57308194
- Tender notice
- Please follow this link to view the notice.
Additional text
-
Carnwath Road, SW6 3HR.
Award information
Awarded date
26 July 2022
Contract start date
8 August 2022
Contract end date
19 December 2022
Total value of contract
£126,425
This contract was awarded to 1 supplier.
Address
Reference
None
Value of contract
£126,425