Published date: 28 April 2023

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 2 December 2022, 11am

Contract summary

Industry

  • Performance review services - 79313000

Location of contract

North West

Value of contract

£97,200

Procurement reference

20230428140715-3510

Published date

28 April 2023

Closing date

2 December 2022

Closing time

11am

Contract start date

17 February 2023

Contract end date

31 May 2023

Contract type

Service contract

Procedure type

Other

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

There is a requirement for Sellafield ( to approach operations and maintenance with a manufacturing mindset where asset and process underperformance issues (which cause process bottlenecks) are identified prioritised based on value and solutions (both technology and operational) developed and implemented at pace All of the above steps require an ability to support each other with the core focus being to improve performance and reliability. Across the site, there are several examples of equipment underperformance including reduced throughput, high levels of planned and unplanned maintenance, unstable operations, equipment availability. Current methods of asset maintenance are either planned (based on elapsed time from installation) unplanned (reactive) These methods are as opposed to the approach of maintenance which is informed by actual asset use or its condition. As a result, the root causes of asset underperformance are not being fully identified and addressed and can cause repeat events. In response to this the Enterprise Asset Management (EAM) programme at SL has identified a need to develop predictive asset management problem solving capabilities that are underpinned by data and the application of data science methods to inform decisions. This capability has been broadly termed Industrial Reliability and Performance Improvement (IRPI). IRPI is at a relatively early stage of capability development currently defining its scope of work. As maintenance is either planned or unplanned currently, there is no strategy to change to a predictive maintenance regime within the current constraints and processes.


Award information

Awarded date

13 December 2022

Contract start date

17 February 2023

Contract end date

31 May 2023

Total value of contract

£97,200

This contract was awarded to 1 supplier.

Ada-Mode

Address

77-81 Alma Road
Clifton
Bristol
BB8 2DP

Reference

None

Supplier is SME?

No

Supplier is VCSE?

No


About the buyer

Contact name

Martin Ellicott

Address

Calder Bridge
Seascale
CA20 1PG
ENG

Telephone

+44 7855149009

Email

Martin.x.ellicott@sellafieldsites.com

Website

https://www.gov.uk/government/case-studies/shared-services-alliance-ssa-for-nuclear-decommissioning-estate