Published date: 7 May 2019
This notice was replaced on 18 October 2019
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Awarded contract (published 18 October 2019)
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Petroleum products, fuel, electricity and other sources of energy - 09000000
Fuel cells - 31122100
Fuel-gas systems - 42113390
Other sources of energy supplies and distribution - 65400000
Energy and related services - 71314000
Location of contract
Yorkshire and the Humber
Value of contract
£220,000
Procurement reference
2239/DM
Published date
7 May 2019
Closing date
3 June 2019
Contract start date
27 June 2019
Contract end date
28 June 2019
Contract type
Supply contract
Procedure type
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
With co-funding from the European Regional Development Fund, the University of Sheffield is establishing a flagship national Translational Energy Research Centre (TERC) and is looking to procure and integrate into a mini-grid system a range of bioenergy and renewable energy generating equipment Carbon Capture, Utilisation and Storage (CCUS), fuel cells and electrolysers. Hydrogen is a fundamental element in the transition to low carbon (or hydrogen) economy and hydrogen generation will form a key part of the integrated infrastructure in the Centre. This capability will support R&D activities associated hydrogen utilisation as fuel and/ or energy store, and as a transformational feedstock.
The hydrogen generated will be utilised: (i) as fuel for a polymer electrolyte membrane (PEM) fuel cell and/or fuel-cell-based micro combined heat and power (CHP) systems; (ii) additive to conventional fuels for energy generation; and (iii) for carbon dioxide utilisation applications such as liquid/gaseous fuel generation. Therefore, as part of the equipment portfolio, we are looking to procure an electrolyser capable of generating ≥ 20 Nm3/hr (preferably ≥ 30 Nm3/hr) of Hydrogen and associated hydrogen storage of minimum 300Nm3/h.
The closing date for tender returns is at 12 noon on 3rd June 2019 (UK time)
More information
Links
-
- https://in-tendhost.co.uk/sheffield/aspx/Home
- Tender notice
- In-tend e-tendering portal
Additional text
-
All tender documents, correspondence & tender returns must be conducted via the In-tend site, through the link provided above.
About the buyer
Contact name
David Middle
Address
Western Bank
SHEFFIELD
S102TN
England
Telephone
0114 2221560
Share this notice
All content is available under the
