Contract summary

Industry

  • Signage - 34928470

  • Construction work for university buildings - 45214400

Location of contract

W5 5RF

Value of contract

£0

Procurement reference

20221202153840-86869

Published date

2 December 2022

Closing date

13 January 2023

Closing time

12pm

Contract start date

6 February 2023

Contract end date

30 September 2023

Contract type

Works

Procedure type

Restricted procedure

A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The University of West London (UWL) wishes to appoint a professional firm to provide works as per the requirement in the pre-construction document.

The University of West London wishes to engage a Principal Contractor to provide a key-turn solution to investigate, survey, design, supply and install new replacement external signage under Design & Build procurement, to the external façade of Paragon House at the Brentford Campus. The works include; removal of existing signage and associated fixings; structural surveys and façade investigations, design, manufacture, supply and installation of 4 new signs (3 No. high level and 1 No. low level) including all associated fixings and lighting provision as per the design intent.

The works are to take place whilst the building is fully operational with both staff, students and external hire guests making use of the building throughout the programme as well as other small works contractors undertaking business-as-usual maintenance and works.

The new contract will commence from February 2023 and must complete by 1 September 2023 including all design, manufacture and installation.