Published date: 14 July 2022
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Structures of bridges - 44212120
Construction work for bridges - 45221100
Bridge construction work - 45221110
Road bridge construction work - 45221111
Railway bridge construction work - 45221112
Footbridge construction work - 45221113
Bridge-design services - 71322300
Location of contract
London
Value of contract
£1,000,000 to £2,500,000
Procurement reference
C4A57280947
Published date
14 July 2022
Closing date
16 August 2021
Closing time
1:38pm
Contract start date
6 December 2021
Contract end date
31 December 2023
Contract type
Works
Procedure type
Call-off from a framework agreement
A mini-competition or direct purchase from a pre-established framework agreement.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North.
Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - S1 and S2 tunnels.
S1 includes two 9 km twin bored tunnels between the new HS2 stations, Euston and Old Oak Common.
S2 continues from Old Oak Common with 15 km of twin bored tunnels to West Ruislip where there is approximately 5 km of open route before transitioning into C1 lot (managed by Others).
SCS's scope will include the full design of all Main Civil Works for the Lots S1 and S2 of HS2.
The Project is split down into three areas, Area East (Euston), Area Central (Old Oak Common) and Area West (West Ruislip).
This opportunity currently relates to works that will occur in Area West, which extends from West Ruislip to Old Oak Common, although there may be the possibility to extend the scope to cover Area Central and Area East at a later date once requirements have ascertained.
Buildings, bridges and other assets along the route of the tunnels need to be prepared for the tunnel boring machines (TBMs) to be driven through underground and remediated/repaired afterwards in the event of damage as a result of movement and the like.
The specific scope for this opportunity is:
The provision of all management, supervision, labour, plant, materials, equipment and consumables (including fuels) necessary to carry out and complete the design, supply, delivery, installation, maintenance, testing and commissioning of the Bridge work consisting of:
General Items:
• Assessment and design of solutions for permanent works as may be required including associated drawings, calculations and P.I. insurance.
• Design and provision of any necessary temporary works required including the associated drawings, calculations and P.I. insurance.
• All necessary access provisions and equipment.
• Coordination and integration with other trades and subcontractors to properly complete the works.
• Necessary expertise, experience, assurances and approvals relating to working in Network Rail, London Underground and Highways environments.
• Capability for the fabrication/manufacture of works off-site.
• Assistance and support in the preparation for, and acquisition of, any required licenses, consents, approvals and permissions.
• BIM capability is preferable although not critical.
Bridge Works includes:
• Supply of the Hydraulic Jacking Frames and associated materials required to construct the approved design solution.
• Installation of the Hydraulic Jacking Frame solution.
• Commission, maintenance and removal of the hydraulic jacking frames.
• Bearing(s) replacement.
• Supply of the materials to construct the approved structural strengthening design solution.
• Installation of the structural strengthening design solution.
• Provision of input to provide assessment and production of the detailed design inclusive of relevant CAT2/CAT3 checks.
• Production of detailed fabrication and shop drawings.
When selecting a supplier SCS look for alignment of values, behaviours and cultures, between ourselves and our supply chain. SCS and HS2 have aligned their values to the following:
* Safety
* Integrity
* Leadership
* Respect
Please refer to HS2 supplier guide. ( https://www.gov.uk/government/publications/hs2-supplier-guide)
In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include:
* Making HS2 affordable
* Delivering on promises
* We build with people in mind
* Delivering more than a railway
* Achieving more together
* Creative and challenging
Successfully shortlisted supplier's will be those with verifiable experience, the appropriate capability and resources to deliver the scope of works. During this stage supplier's may then be invited to the project to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted.
Shortlisted suppliers will be sent a Prequalification Questionnaire (PQQ) request. Suppliers successfully selected through the prequalification will be invited to provide a formal competitive tender for the services.
The Invitation to Tender (ITT) and final selection will be based upon a balanced scorecard, requiring suppliers to demonstrate their ability to work with the projects values and behaviours in mind, whilst proving their capabilities and competence, through qualitive and quantative evidence.
We are an unincorporated joint venture between Skanska, Costain and Strabag working on HS2 main works civil engineering contract for Section 1 and Section 2 of the planned HS2 route. Not only have the individual companies delivered high speed rail, major infrastructure and some of the most iconic structures internationally, the joint venture also has a proven record of working together. Skanska and Costain have a long history of successfully delivering civil engineering projects together in the UK, dating back 30 years. In joint venture they have delivered many major infrastructure projects, including the M25 in the 1980s, High Speed 1 in the early 2000s and the current Crossrail endeavor coming to completion under the streets of London. STRABAG and Skanska have worked together for over 15 years on European projects in Switzerland, Slovakia and Norway. As a joint venture, we are bringing together our collective strength to deliver world-class engineering, contributing to the long term economic growth of local and international markets. This is perfectly encapsulated in our mission; to draw everyone together to create a strong foundation from which to launch a transformative legacy.
More information
Previous notice about this procurement
- Opportunity
- Published 10 August 2021
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=57280968
- Tender notice
- Please follow this link to view the notice.
Award information
Awarded date
7 February 2022
Contract start date
6 December 2021
Contract end date
31 December 2023
Total value of contract
£0
This contract was awarded to 3 suppliers.
Freyssinet Limited
Address
Innovation House, Euston Way, Town Centre
Telford
TF34LTReference
None
Value of contract
£0
VolkerLaser Ltd
Address
The Lodge, Blackpole Road
Worcester
WR49FHReference
None
Value of contract
£0
J Coffey Construction Limited
Address
93 - 95 Greenford Road
Harrow
HA1 3QFReference
None
Value of contract
£0
About the buyer
Contact name
Andrew Smith
Address
Victoria House, Bloomsbury Square
London
WC1B 4DA
UK
Telephone
07817520144
Share this notice