Published date: 25 January 2022

This notice was replaced on 28 March 2023

This notice does not contain the most up-to-date information about this procurement. The most recent notice is:

Awarded contract (published 28 March 2023)

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Contract summary

Industry

  • Construction work - 45000000

Location of contract

LA1 4YW

Value of contract

£1,000,000 to £1,300,000

Procurement reference

SP/21/1229

Published date

25 January 2022

Closing date

22 February 2022

Closing time

10am

Contract start date

16 May 2022

Contract end date

26 August 2022

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

To begin the bidding process for this project, please access the project through our e-tendering system, In Tend (https://in-tendhost.co.uk/lancaster/aspx/Home). Please complete the Selection Stage documentation, fill and return through the portal.

Please submit any clarifications prior to COB 15th February 2022 - we cannot guarantee a response to clarifications received after this date, although we will endeavour to answer any questions received.

Overview:
Furness College currently comprises college offices, reception, foyer, and bar to the A floor, offices to the B & C Floors, and roof top flats to the D Floor.

The scope of works is to convert the existing Furness College C Floor Offices into seven Apartments with between nine and ten bedrooms per Apartment block. The current RIBA Stage 2 proposal totals 65 bedrooms. Each bedroom will be furnished with a fitted bed, desk, and wardrobe, with individual Wi-Fi access point and data connection; whilst each flat will be fitted out with a communal kitchen/living space and shower rooms.

The provision of new kitchens, shower rooms and the inclusion of washbasins in each bedroom will require new Soil and Vent Pipes to be installed and connected to the existing foul drainage system below ground level. Core drilling through the concrete floor slabs will be necessary for the drainage systems to be commissioned and new pipe boxings, bulkheads, and false ceilings will need to be constructed on the A & B Floors. To limit disruption to the occupants of the B Floor, some staged completion and decanting of staff may be necessary.

New L2 fire detection and alarm systems will be installed to the Apartments.

The construction work is planned to take place during the summer of 2022 but the campus will remain live with staff and students still living and working around the site.

Construction cost estimate for the scheme is currently in the range of £1m to £1.3m.

There is no work to be completed in Bowland Annexe.


About the buyer

Contact name

Laura Edwards

Address

University House
LANCASTER
LA14YW
England

Telephone

01524 592 537

Email

l.v.edwards@lancaster.ac.uk

Website

https://in-tendhost.co.uk/lancaster/aspx/Home