Published date: 5 March 2024
Last edited date: 5 March 2024
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction work - 45000000
Works for complete or part construction and civil engineering work - 45200000
Engineering works and construction works - 45220000
Location of contract
WS1 1TP
Value of contract
£0
Procurement reference
IT-255-686-WP3846 - AWARD
Published date
5 March 2024
Closing date
18 December 2023
Closing time
11am
Contract start date
1 April 2024
Contract end date
1 April 2025
Contract type
Works
Procedure type
Restricted procedure
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
Walsall Council is looking for a suitably qualified contractor to complete the construction of a new replacement York's Bridge on Norton Road, Pelsall, which spans the Wyrley and Essington Canal by the Fingerpost public house.
Background of the existing York's Bridge
The existing historic York's Bridge dates back to the mid 1800's. Its brick arch construction, poor alignments and lack of footways make it unsuitable for modern traffic and unsafe for pedestrians and cyclists. The bridge structure has suffered over recent decades and the bridge is currently the subject of a 10 tonne weight limit. If nothing is done the bridge will continue to weaken to the point where closure to all road traffic might have to be considered.
The Council has a statutory duty to maintain the safe and efficient operation of the public highway for use by a range of vehicles and is obliged to look at a range of options, including the strengthening of bridges which it does not own, (the existing bridge is owned by the Canal & River Trust), and the construction of new bridges.
Several options for addressing the problems at York's Bridge have been considered, including strengthening of the existing bridge. It has been concluded that only the construction of a new bridge can address all of the issues, whilst retaining the existing historic York's Bridge
The new York's Bridge
The construction of a new bridge aims to create a healthier and safer environment for people to walk and cycle and traffic moving through the area. The new bridge will be constructed to the east side of the existing bridge and to realign Norton Road to the east. The bridge is 40m long and will carry two-way traffic on a 7.3m wide carriageway with a 2m wide footway on the west side. There is 2m minimum headroom between the bridge and towpath and 3.1m minimum between the bridge and canal. A small amount (2,465m2) of common land is required in order to construct the new bridge which is less than 0.01% of the total common area.
Award information
Awarded date
5 March 2024
Contract start date
1 April 2024
Contract end date
1 April 2025
Total value of contract
£0
This contract was awarded to 1 supplier.
McPhillips
Address
Horton House, Hortonwood 50, Telford, United Kingdom, TF1 7FG
Reference
None
About the buyer
Contact name
Stacey Hackett
Address
Darwall Street
Walsall
West Midlands
WS1 1TP
United Kingdom
Telephone
123456
Website
Share this notice
Closing: 18 December 2023, 11am