Published date: 5 June 2023
Last edited date: 5 June 2023
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Cliff-protection works - 45243100
Cliff-stabilisation works - 45243110
Location of contract
South East
Value of contract
£5,000,000
Procurement reference
Port of Dover
Published date
5 June 2023
Closing date
21 July 2023
Closing time
12pm
Contract start date
13 November 2023
Contract end date
1 July 2027
Contract type
Works
Procedure type
Negotiated procedure without prior publication (above threshold)
The opportunity was not advertised, because for example only one supplier is capable of delivering the requirement, or due to extreme urgency brought about by unforeseen events.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The Contractor provides the management and implementation of the Rockfall Protection Systems
'Phase II - Phase V', summarised below:
• Phase II (Envisaged Commencement within 2023)
The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 223m (linear) of a 5m high (projection) GBE-500A rockfall barrier (and approximately 450m2 of a TECCO Stainless Steel (G65/3) slope stabilisation system) manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
• Phase III Envisaged Commencement within 2024)
The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 191m (linear) of a 3m high (projection) GBE-500A rockfall barrier manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
• Phase IV Envisaged Commencement within 2025)
The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation systems and the replacement installation of approximately 2750m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
• Phase V Envisaged Commencement within 2026)
The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation system and the replacement installation of approximately 2400m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system (and approximately 12m2 of a SPIDER 'S3-130' rock protection system), manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
About the buyer
Contact name
Max Edinburgh
Address
Harbour House,Marine Parade
DOVER
CT161JA
England
Telephone
01304 240400
podprocurement@portofdover.com
Website
Share this notice
Closing: 21 July 2023, 12pm