Published date: 13 November 2018
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Industrial machinery - 42000000
Construction work - 45000000
Mechanical installations - 45350000
Installation services of electrical and mechanical equipment - 51100000
Location of contract
SP4 0JG
Value of contract
£0
Procurement reference
tender_193888/726049
Published date
13 November 2018
Closing date
11 December 2018
Contract start date
14 January 2019
Contract end date
29 November 2019
Contract type
Works
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
situated behind building 6. Chilled water fir the BIG North Side is provided by a TRANE and Carrier unit, situated next to the incinerator. These units provide chilled water through approximately 200M of pipe that is buried in the ground and inaccessible. Given that the chiller plants have been subject to continual maintenance issues, due to age (in part) and accessibility, focus is required to resolve the continuing problems.
The BIG clean side Chillers
The duty stand-by pumps are in very poor condition with evidence of corrosion and leakage. The BMS also indicates a failure on one of the primary circuit pumps. Unless rectified resilience to these critical systems will be compromised.
Evidence suggests the chillers are oversized for their connected load. Also due to their location, there is a large amount of pipe-work within the underground void which is difficult to reach and repair.
The chillers have reached a point where whole sale repairs and or change for new needs to be carried out to maintain N+1 resilience (duty & standby).
BIG North Side
The Trane chiller has been partially de-gassed and only one refrigerant circuit is operational; therefore it is down on duty by 50%. The chiller is also near the end of its life expectancy and is considered for replacement.
The contractor is to provide a design and build solution to RIBA 6. The solution must include all mechanical, electrical, civil and controls (BMS etc) works required to install the chillers.
1. 180046 Chiller Plant WI
2. CDM Info pack BIG Chillers (to be issued)
3. PHE-PD-URS-180046 Chiller Plant 02 Oct 2018 - Draft
4. Annex A
There are also other relevant documents that have been included within the attachment section of the Bravo e-tendering portal ITT form for information and these will require referencing to submit a full response.
More information
Links
-
- https://phe.bravosolution.co.uk
- Tender notice
- Procurement Documentation
Additional text
-
To view and apply for this opportunity you will need to be registered with PHE.Bravo
Share this notice
Closing: 11 December 2018