Published date: 13 November 2018

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 11 December 2018

Contract summary

Industry

  • Industrial machinery - 42000000

  • Construction work - 45000000

  • Mechanical installations - 45350000

    • Installation services of electrical and mechanical equipment - 51100000

Location of contract

SP4 0JG

Value of contract

£0

Procurement reference

tender_193888/726049

Published date

13 November 2018

Closing date

11 December 2018

Contract start date

14 January 2019

Contract end date

29 November 2019

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

situated behind building 6. Chilled water fir the BIG North Side is provided by a TRANE and Carrier unit, situated next to the incinerator. These units provide chilled water through approximately 200M of pipe that is buried in the ground and inaccessible. Given that the chiller plants have been subject to continual maintenance issues, due to age (in part) and accessibility, focus is required to resolve the continuing problems.


The BIG clean side Chillers

The duty stand-by pumps are in very poor condition with evidence of corrosion and leakage. The BMS also indicates a failure on one of the primary circuit pumps. Unless rectified resilience to these critical systems will be compromised.

Evidence suggests the chillers are oversized for their connected load. Also due to their location, there is a large amount of pipe-work within the underground void which is difficult to reach and repair.

The chillers have reached a point where whole sale repairs and or change for new needs to be carried out to maintain N+1 resilience (duty & standby).

BIG North Side

The Trane chiller has been partially de-gassed and only one refrigerant circuit is operational; therefore it is down on duty by 50%. The chiller is also near the end of its life expectancy and is considered for replacement.

The contractor is to provide a design and build solution to RIBA 6. The solution must include all mechanical, electrical, civil and controls (BMS etc) works required to install the chillers.


1. 180046 Chiller Plant WI
2. CDM Info pack BIG Chillers (to be issued)
3. PHE-PD-URS-180046 Chiller Plant 02 Oct 2018 - Draft
4. Annex A

There are also other relevant documents that have been included within the attachment section of the Bravo e-tendering portal ITT form for information and these will require referencing to submit a full response.


More information

Links

Additional text

To view and apply for this opportunity you will need to be registered with PHE.Bravo


About the buyer

Address

Manor Farm Road
Porton
SP4 0JG
England

Email

jeff.pike@phe.gov.uk