Published date: 20 April 2022
Last edited date: 27 May 2022
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Petroleum products, fuel, electricity and other sources of energy - 09000000
Research, testing and scientific technical simulator - 38970000
Research and development services and related consultancy services - 73000000
Location of contract
Yorkshire and the Humber
Value of contract
£3,455,000
Procurement reference
3321/DM
Published date
20 April 2022
Closing date
10 June 2022
Closing time
12pm
Contract start date
1 July 2022
Contract end date
28 February 2023
Contract type
Supply contract
Procedure type
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
The University of Sheffield's Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology to fulfil two grant funded project headings; Power to Sustainable Fuel Pilot Plant and Methanation Plant (Fischer Tropsch Rig). The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
The tender is for a full turn-key solution including: design, build, installation and commissioning of all elements of the plant from cleaning and preparation of the feed gases, through to conversion of CO2 and H2 to syngas; reaction of the syngas in an FT reactor; and product upgrading steps to achieve the desired product. The selected tenderer will be the Principal Designer and the Principal Contractor for the project with respect to CDM regulations.
This tender comprises of 8 individual lots;
1A: Feed gas clan up & conditioning module
1B: Biomass syngas clean up & conditioning module (as add-on to 1A)
2: Reverse Water Gas Shift (RWGS) module
3: Blending skid
4: Fischer-Tropsch reactor
5: Hydrocracking & hydrogeneration reactor
6: Distillation module
7: Online process analyser
Further details relating to the overall technical & commercial requirements for the above, can be found within the tender documents.
More information
Links
-
- https://in-tendhost.co.uk/sheffield/aspx/Home
- Contract notice
- In-tend e.tendering portal
Additional text
-
All tender documents, tender returns & any correspondence must be conducted through the In-tend site via the link shown above
About the buyer
Contact name
David Middle
Address
Western Bank
SHEFFIELD
S102TN
England
Telephone
0114 2221560
Share this notice
Closing: 10 June 2022, 12pm