Published date: 26 June 2025

Closed future opportunity - This means that a potential contract has passed its approach to market date. A buyer can choose to consider any supplier interest or convert this notice into an opportunity ready for live procurement.


Approach to market date: 1 September 2025

Contract summary

Industry

  • Maintenance hangar construction work - 45213351

Location of contract

PO1 3LS

Value of contract

£500,000

Procurement reference

tender_497426/1494933

Published date

26 June 2025

Approach to market date

1 September 2025

Contract start date

1 December 2025

Contract end date

1 October 2026

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

Yes


Description

Survey, Design & Installation of Ship Hall Mega Doors
Building 1/122 Ship Hall B was built in 2003. The north elevation has a large opening
(circa 47.1 m x 32.3 m) completed by two vertical lift fabric doors, separated by a
removeable central mullion. Both doors and mullion are in a poor material condition
after 20 years, and the right-hand door (viewed from external) was damaged during a
storm in November 2024. The aim of this project is to replace the doors and associated
equipment.

The contractor shall develop a fully detailed and construction-ready design package that
includes technical drawings, installation methodologies, and a comprehensive compliance
plan to ensure all regulatory requirements are met. The design shall demonstrate a clear
path for commissioning, testing, and integration with other systems.


About the buyer

Address

Victory Building, Portsmouth Naval Base
Portsmouth
PO1 3LS
England

Email

SCBasePersonnel@kbsmaritime.com